Development Assessment Report · OPW16/0016
Attached to the e-mail OPW16/0016 - Operational Works Application.
Project Urban – 15253 February 2016
immunity from flooding and storm tide inundation.
The proposed deck has been designed by an RPEQ
who specializes in Marina type developments to
ensure the proposal is adequately designed to
reasonably withstand the potential impacts of
natural hazards.
(4) avoids risks to public safety and the Not applicable – The proposal is for operational
environment from the location of hazardous works for a deck only. The deck will not be used
materials and the release of these materials as a for the storage of hazardous materials.
result of a natural hazard, and
(5) maintains or enhances natural processes and Complies – The proposal largely maintains the
the protective function of landforms and existing natural landform and allows for the
vegetation that can mitigate risks associated with existing flows and natural processes of the Noosa
the natural hazard, and River.
(6) is not located in an erosion prone area within a Not applicable – the proposed deck is not
coastal management district unless: located within a coastal management district.
(a) it cannot feasibly be located elsewhere, and
(b) is coastal-dependent development, or
temporary, readily relocatable or able-to-be-
abandoned development, and
(7) that is the redevelopment of existing Not applicable – the proposal is for a new deck
permanent buildings or structures, is located structure.
outside an erosion-prone area or, where this is not
feasible, redevelopment:
(a) is located:
i. as far landward from the seaward
property boundary as possible, or
ii. landward of the seaward alignment of the
neighbouring buildings, and
(b) provides space seaward of the development
within the premises to allow for the future
construction of erosion control structures, such
as a seawall, and
(8) proposes to undertake coastal protection work Complies – the development does not propose
(excluding beach nourishment) only as a last resort coastal protection works. The proposed deck has
where coastal erosion presents an imminent threat been designed by an RPEQ who specializes in
to public safety or existing buildings and Marina type developments to ensure the proposal
structures, and all of the following apply: is adequately designed to withstand any possible
(a) the property cannot reasonably be erosion issues.
relocated or abandoned, and
(b) any coastal protection works to protect
private property is located as far landward as
practicable and on the lot containing the
property to the maximum extent reasonable,
and
(c) the coastal protection work mitigates any
increase in coastal hazard risk for adjacent
areas.
Development Assessment Report Page 10 of 14
Operational Works for Prescribed Tidal Works
2 Parkyn Court, Tewantin
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Assessment Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.