Specific Outcomes Probable Solutions Proposal
trailer; the revetment wall is no more than
b) ensure that unacceptable risks to 150mm above the top of the wall, not
personal and public safety are unlikely more than 500mm below the top of the
to be caused; wall and not more than 200mm above
c) avoid cluttering of the watercourse; the existing beach; and
d) avoid excessive traffic volumes within b) The ramp extends into the
foreshore areas and adjoining lands; watercourse no more than 9m from a
and revetment wall;
e) ensure that visual amenity of the
foreshore is maintained.
AND Not applicable – the proposal is not
S10.2 The ramp is constructed at a for a boat ramp.
uniform grade and no steeper than 1 in
5 (20%);
1. AND Not applicable – the proposal is not
S10.3 The outer end of the ramp is no for a boat ramp.
more than 100mm above the level of
the beach;
AND Not applicable – the proposal is not
S10.4 No part of the ramp is to extend for a boat ramp.
closer than 1m to the prolongation of
the boundaries. (Refer Figure 14-33)
Figure 14-33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Assessment Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.