Development Assessment Report · OPW16/0016
Attached to the e-mail OPW16/0016 - Operational Works Application.
(c) if a relevant planning scheme
standard is more stringent than
the standard mentioned in
paragraph (a) or (b)—the
relevant planning scheme
standard, to the extent the
standard is more stringent than
the standard mentioned in
paragraph (a) or (b);
(d) any other relevant planning
scheme standard that is not
inconsistent with the standards
mentioned in paragraphs (a) to
(c).
Signage
Not Applicable – No new signage is proposed within tidal works.
Earthwork and vegetation
7.1 Excavation and filling for prescribed The earthwork and filling for the Not Applicable – No excavation or
tidal work— prescribed tidal work is consistent with filling is proposed as part of the works.
each relevant planning scheme
a) is carried out only to the extent standard.
reasonably necessary for the work; and
b) does not have a significant
adverse effect on—
i) the natural features of the tidal
water under, within or over which the
work is located; or
ii) the level of the surface of the land
under the tidal water under, within or
over which the work is located, or any
foreshores near the work.
7.2 The location of prescribed tidal work The vegetation in the tidal water, under Complies – No vegetation will be
ensures vegetation is cleared or within or over which the prescribed tidal affected by the prescribed tidal works.
disturbed only to the extent reasonably work is located, or on land under the
necessary for the work. tidal water, is cleared or disturbed in a
way consistent with each relevant
planning scheme standard.
7.3 Any vegetation damaged, destroyed Vegetation affected by the prescribed Complies – No Vegetation will be
or removed by prescribed tidal work tidal work is dealt with in a way affected by the prescribed tidal works.
under, within or over tidal water other consistent with the following standards—
than an artificial waterway, is replaced
with appropriate vegetation. (a) subject to paragraph (b),
vegetation damaged, destroyed
or removed by prescribed tidal
work is replaced with native
vegetation for the locality within
which the work is located, to the
extent it is reasonably
practicable to replace the
vegetation with native
vegetation;
(b) if a relevant planning scheme
standard is more stringent than
the standard mentioned in
paragraph
(c) —the relevant planning scheme
standard, to the extent it is
more stringent than the
standard mentioned in
paragraph (a);
(d) any other relevant planning
scheme standard that is not
inconsistent with the standards
mentioned in paragraphs (a) and
(b).
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Assessment Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.