Development Assessment Report · OPW16/0016
Attached to the e-mail OPW16/0016 - Operational Works Application.
Public access—availability
8.1 Prescribed tidal work does not have The design and construction of the Complies – The proposed deck is
a significant adverse effect on the prescribed tidal work is consistent with wholly contained within the Noosa
availability of public access to the following standards— Marina lease area and does not restrict
foreshores, including public access existing public access to the Noosa River
proposed in the relevant planning (a) subject to paragraph (b), foreshore.
scheme. prescribed tidal work does not
involve the erection or
placement of any physical
barrier preventing existing
access, along a public
accessway, to the foreshores
near the work;
(b) if a relevant planning scheme
standard is more stringent than
the standard mentioned in
paragraph
(c) —the relevant planning scheme
standard, to the extent it is
more stringent than the
standard mentioned in
paragraph (a);
(d) any other relevant planning
scheme standard that is not
inconsistent with the standards
mentioned in paragraphs (a) and
(b).
Public access—safety
9.1 The location and design of Public access to foreshores near the Complies – The proposed deck is
prescribed tidal work does not adversely prescribed tidal work is consistent with wholly contained within the Noosa
affect the safety of members of the each relevant planning scheme Marina lease area and does not impact
public accessing the foreshores. standard. any public access to the foreshore.
Navigable access to, or egress from, non-tidal work lots
10.1 Prescribed tidal work does not The design and construction of the Complies – the prescribed tidal work is
adversely affect navigable access to, or prescribed tidal work is consistent with wholey contained within the Noosa
navigable egress from, any non-tidal the following standards— Marina lease area and will not adversely
work lot. affect navigable access to, or navigable
(a) subject to paragraph (b), if the egress from, any non-tidal work lot.
lot connected to prescribed tidal
work (the connected lot)
adjoins a non-tidal work lot, the
work does not extend past the
connected lot’s side boundary,
or extended side boundary,
adjoining the non-tidal work lot;
(b) if a relevant planning scheme
standard is more stringent than
the standard mentioned in
paragraph (a) the relevant
planning scheme standard, to
the extent it is more stringent
than the standard mentioned in
paragraph (a).
Infrastructure, including, access, parking, sewerage and water services
11.1 Prescribed tidal work has The infrastructure for prescribed tidal Complies – the subject site is currently
appropriate infrastructure, including, in work is consistent with each relevant connected to all appropriate
particular, road access, parking planning scheme standard. infrastructure, including, road access,
facilities, sewerage services and water parking facilities, sewerage services and
services, having regard to— water services. The proposed works do
not require any further infrastructure
a) the nature and scale of the work; and connections or upgrades.
b) the number of people that may be on
or at the work at any time; and
c) the number of vehicles that may be
on or moored at the work at any time;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Assessment Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.