Development Assessment Report · OPW16/0016
Attached to the e-mail OPW16/0016 - Operational Works Application.
12.7 Prescribed tidal work is designed The design and construction of the Complies – the proposed works will be
and constructed in a way to ensure it is prescribed tidal work is consistent with constructed in accordance with current
safe for persons standing or walking on the following standards— best practice, and will not be slippery or
the work. have any feature that may cause a
(a) subject to paragraph (c), any person to trip or fall. Access to work
surface of prescribed tidal work areas will be restricted by means of
on which a person may stand or physical barriers and signage where
walk is— appropriate.
i) not slippery; and
ii) does not have any
feature that may cause
the person to trip or fall;
(b) subject to paragraph (c), any
part of prescribed tidal work that
is unsafe for persons standing or
walking on the work is
surrounded by adequate barriers
to deter persons from entering
the part;
(c) if a relevant planning scheme
standard is more stringent than
the standard mentioned in
paragraph (a) or (b)—the
relevant planning scheme
standard, to the extent it is
more stringent than the
standard mentioned in
paragraph (a) or (b).
12.8 Appropriate measures are taken The design and construction of the Not applicable – the works are for
for prescribed tidal work for a non- prescribed tidal work is consistent with private purposes.
private purpose to ensure an the following standards—
unsupportable live load is not applied to
the work by persons or vehicles. (a) subject to paragraph (b),
prescribed tidal work has
erected or placed in position on
or near the work, a sign that—
i) is visible at all times;
and
ii) states the maximum live
load that may be applied
to the work, in terms of
the maximum number of
persons that may be on
the work at any given
time or the maximum
number of vehicles of a
particular type that may
be on or moored at the
work at any given time;
(b) if a relevant planning scheme
standard is more stringent than
the standard mentioned in
paragraph (a)—the relevant
planning scheme standard, to
the extent it is more stringent
than the standard mentioned in
paragraph (a).
12.9 Prescribed tidal work, other than a The design and construction of the Not Applicable - Works not in a canal
boardwalk or an independent deck for a prescribed tidal work is consistent with
private purpose, is designed and each relevant planning scheme
constructed in a way that ensures the standard.
use of tidal water in a canal for a non-
maritime purpose is minimised.
12.10 Prescribed tidal work that is a (s 6(2) solution) The design and Not Applicable - Works not in a canal
boardwalk or an independent deck and construction of the boardwalk or deck is
for a private purpose, is designed and consistent with the following standards—
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Assessment Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.