12.4 Prescribed tidal work is designed The design and construction of the Complies – the prescribed tidal works
and constructed using materials having prescribed tidal work is consistent with have been designed with regard to all
a long life in marine environments, the following standards— appropriate Australian standards, and
having regard to their ability to resist current best practice. Please refer to the
the following— (a) subject to paragraph (b), each attached Proposal Plan prepared by
Australian Standard relevant to International Marina Consultants.
a) attack by marine organisms; the materials that should be
used, or the measures that
b) corrosion; should be taken to treat
materials used, for structures, to
c) deterioration resulting from abrasion the extent the requirements
or immersion in seawater. stated in the Standard apply to
structures located in a marine
environment;
(b) if a relevant planning scheme
standard is more stringent than
the standard mentioned in
paragraph (a)—the relevant
planning scheme standard, to
the extent it is more stringent
than the standard mentioned in
paragraph (a).
12.5 Prescribed tidal work is designed The design and construction of the Complies – The prescribed tidal work
and constructed in a way to ensure it prescribed tidal work is consistent with will not adversely affect the operation or
does not adversely affect the operation the following standards— maintenance of any existing stormwater
or maintenance of any existing outlet.
stormwater outlet. (a) subject to paragraph (c), vessels
moored at prescribed tidal work
do not impede the discharge of
stormwater;
(b) subject to paragraph (c),
prescribed tidal work does not
restrict access to any
stormwater outlet;
(c) if a relevant planning scheme
standard is more stringent than
the standard mentioned in
paragraph (a) or (b)—the
relevant planning scheme
standard, to the extent it is
more stringent than the
standard mentioned in
paragraph (a) or (b).
12.6 Prescribed tidal work is designed The design and construction of the Complies – the prescribed tidal works
and constructed in a way to ensure it prescribed tidal work is consistent with have been designed with regard to all
does not adversely affect the water the following standards— appropriate Australian standards. The
quality of any tidal water, including, in tidal works will be conducted in
particular, as a result of— (a) subject to paragraph (b), each accordance with current best practice
Australian Standard relevant to and will not result in the release of
a) release, into the tidal water, of the design or construction of contaminants in the river.
materials used in the construction of the structures under, within or over
work; or tidal water, to the extent the
requirements stated in the
b) disturbance to the sediment on the Standard are directed at
bed and banks of the tidal water; or maintaining the water quality of
tidal water;
c) exposure to acid sulphate soils.
(b) if a relevant planning scheme
standard is more stringent than
the standard mentioned in
paragraph (a)—the relevant
planning scheme standard, to
the extent it is more stringent
than the standard mentioned in
paragraph (a).
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Assessment Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.