Development Assessment Report · OPW16/0016
Attached to the e-mail OPW16/0016 - Operational Works Application.
Performance outcomes Acceptable outcomes Response Comment
(1)(a) and (b).
AND
AO10.3 Any parts of private P/S The proposed deck is wholly contained
development that extend over tidal within the Noosa Marina lease area. The
water are to be designed, proposed development does not prevent
constructed and used for marine public access to the Noosa River
access purposes only. foreshore in accordance with PO10.
PO11 Private marine development AO11.1 Private marine development The proposed deck is wholly contained
avoids structures attaching to, or and other structures such as decks within the Noosa Marina lease area and
extending across, non-tidal state or boardwalks for private use do not does not extend across non-tidal state
coastal land abutting tidal waters. attach to, or extend across state coastal land.
coastal land that is situated above
the high water mark.
Editor’s note: For occupation permits
or allocations of State land, refer to
the Land Act 1994.
PO12 Further development of AO12.1 The design, construction N/A No artificial tidal waterways are proposed.
artificial waterways avoids or and operation of artificial tidal
minimises adverse impacts on waterways maintains the tidal prism
coastal resources and their values, volume of the natural waterway to
and does not contribute to: which it is connected.
(1) an increase in the risk of AND
flooding or erosion
(2) degradation of water quality AO12.2 The design, construction N/A No artificial tidal waterways are proposed.
(3) degradation and loss of and operation of artificial tidal
matters of state environmental waterways does not increase risk
significance (including, but not from flooding.
limited to, coastal wetlands, AND
fish habitat areas and
migratory species habitat). AO12.3 The design, construction N/A No artificial tidal waterways are proposed.
and operation of an artificial
waterway in connection with the
reconfiguration of a lot ensures:
(1) water inlet and outlets
structures are of sufficient
capacity to maintain the water
quality within the waterway
(2) water discharged from the
artificial waterway protects the
environmental values and
water quality objectives of the
receiving waters
(3) dredged material is not
disposed of to tidal water
beyond the artificial waterway
unless there is a beneficial
reuse, e.g. beach nourishment.
Editor’s note: For more information
on environmental values and water
quality objectives see Schedule 1 of
the Environment Protection (Water)
Policy 2009.
AND
AO12.4 The location of the artificial N/A No artificial tidal waterways are proposed.
waterways avoids matters of state
environmental significance, or does
not result in any significant adverse
impact on matters of state
environmental significance.
PO13 Development does not No acceptable outcome is The proposal does not involve
involve reclamation of land below prescribed. reclamation of land below tidal water.
tidal water, other than for the
purposes of:
(1) coastal-dependent
State development assessment provisions Module 10 — Coastal protection 10.1
Tidal works, or development in the coastal management district state code
23 November 2015 V1.7
Page 10 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Assessment Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.