Performance outcomes                    Acceptable outcomes                     Response     Comment
    development, public marine
    development or community
    infrastructure
(2) strategic ports, boat harbours
    or strategic airports and
    aviation facilities, in
    accordance with a statutory
    land use plan, where there is a
    demonstrated net benefit for
    the state or region and no
    feasible alternative exists
(3) coastal protection work or
    work necessary to protect
    coastal resources or physical
    coastal processes.


Table 10.1.2: Operational work
Performance outcomes                    Acceptable outcomes                     Response     Comment
PO1 Tidal works that is private         AO1.1 The location and design of        N/A          The proposal is not for private marine
marine development does not result      tidal works that is private marine                   development.
in adverse impacts to tidal land.       development:
Editor’s note: In addressing this       (1) is on private land abutting tidal
performance outcome, the applicant            water and used for property
should comply with the performance            access purposes
criteria and acceptable standards       (2) occupies the minimum area
set out in the Operational Policy             reasonably required for its
Building and engineering standards            designed purpose
for tidal works, Department of          (3) is not to be roofed or otherwise
Environment and Heritage                      covered
Protection, 2013.
                                        (4) does not require the
                                              construction of coastal
Editor’s note: Applications should be
                                              protection works, shoreline or
supported by a report certified by
                                              riverbank hardening or
an RPEQ to demonstrate compliance
                                              dredging for marine access
with this performance outcome.
                                        (5) does not adversely impact on
                                              public safety or public access
                                              and use of the foreshore.
PO2 Development does not result         AO2.1 The design and construction       N/A          No artificial tidal waterways are proposed.
in the disposal of material dredged     of the artificial waterway includes
from an artificial waterway into        onsite provisions for drying, re-
coastal waters, with the exception      handling and disposal of dredge
of:                                     material on site to facilitate the
(1) reclamation works, or               timely disposal to land or re-use.
(2) coastal protection works, or
(3) the maintenance of an existing
      artificial waterway and the at-
      sea disposal of material that
      has previously been approved
      for the waterway.
PO3 The design and construction of      AO3.1 The design and construction       N/A          No artificial tidal waterways are proposed.
an artificial waterway maintains        of the artificial waterway provides
coastal landforms.                      for sand bypassing where this is
                                        necessary to prevent erosion of
                                        adjacent coasts and minimise
                                        sedimentation of the waterway.
                                        AND

                                        AO3.2 Clean sand accumulating
                                        within an artificial waterway is
                                        returned to the active beach system,
                                        in preference to disposal on land.
PO4 Development that involves           AO4.1 A management plan for the         N/A          The proposal does not involve dredging.
dredging includes and complies with     development:
a management plan that                  (1) directs the operation of the
demonstrates how environmental               development
impacts will be managed and             (2) identifies disposal methods and

State development assessment provisions                                               Module 10 — Coastal protection          10.1
Tidal works, or development in the coastal management district state code
23 November 2015 V1.7

                                                                                                      Page 11 of 13

Used in these records

About this file

File size
1.6 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Assessment Report.pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.