Prelim Construction Management Plan[1]

of 17

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
4. Construction Methodology

4.1 Demolition and Excavation

Existing services within the site have been located and either capped if redundant or modified if
they are to be used as temporary services for the works.

Minor excavation work will be required on site as per the approved Operational Works Water and
Sewer Plan (03-1159-C1 revision A) contained in RAL21/0028.



4.2 Construction Sequence and Planning

The locations and types of plant may vary depending on the results of more detailed planning as
the design solidifies and the availability of plant is confirmed. There will be 3 distinct phases requiring
different material handling logic to construct the building efficiently and minimise impact on
surrounding streets and neighbours.

The phases are:

       • Phase 1: Site establishment and preparation, site excavation,

       • Phase 2: Disconnection of services, water and sewer works, driveway and crossover works,
            and connection of new works, and

       • Phase 3: Landscaping, cleaning and site reinstatement.

Each phase will not happen in isolation and the staging of them may coincide.



4.3 Rubbish Removal

A designated waste collection area will be provided for onsite that does not receive a substantial
amount of runoff from upland areas and does not drain directly to water body.

Rubbish will be removed from site by a licenced waste contractor ensuring that it is managed to
comply with Noosa Council and their contractor’s requirements. It will be taken to the to a transfer
facility.

Disposal of waste collection bins are to be clearly marked '"conventional waste”, "recyclable" and
"regulated waste".

The Principal Contractor will ensure that all containers are fitted with lids and that waste collection
is scheduled to prevent the containers from overfilling.




RG Strategic                          Preliminary Construction Management Plan                           8
Log in to download the original file

Prelim Construction Management Plan[1].pdf · 2.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.