                                           ANNEXURE A



     Approved Plans
1.   Any vessels (including vessels not owned by the applicant) associated with the marine
     use of the facility:
     a.      may be moored to the northern pontoon, and be located outside, or partially
             outside, of the approved lease area only if the mooring of that vessel in that
             location is:

               i.    temporary; and

               ii.   for a purpose associated with the marine use of the facility, and not for
                     any other purpose;
             but

     b.      must not be otherwise moored or stored outside, or partially outside, of the
             approved lease area.

2.   Development undertaken in accordance with this approval must generally comply with
     the approved plans of development. The approved plans are listed in the following table
     unless otherwise amended by these conditions.
          Plan No.           Rev.     Plan/Document Name                       Date

          26236-J1           D        Jetty Plan and Details prepared by SCG   12 October 2017
                                      Consulting Engineers as amended by
                                      Project BA for Minor Change
                                      Application Annotated 12.10.2018

          26236-S2           C        Jetty Plan and Details prepared by SCG   12 October 2017
                                      Consulting Engineers

          180908                      As Constructed Survey of new Jetty and   27 September 2018
                                      Pontoon in Lot 163 on CP907408

3.   All structures associated with the jetty and pontoon must be constructed wholly within
     the approved area
4.   Structures must be designed and constructed such that they are free standing within the
     waterway and are not connected to or behind the revetment wall or rock wall
5.   Structures must be designed and constructed such that they do not place additional
     vertical or lateral loads onto the existing revetment wall that may compromise the long
     term stability and/or durability of the wall. Upon completion of works, a certification by
     RPEQ must be provided to Council in this regard.
6.   All structures must have no detrimental effects on stormwater drains and/or easements.
7.   No boatlifting devices are to be attached or moored at the structures for the purpose of
     elevating a vessel above the water without Council approval.
8.   The jetty and deck areas must be constructed in a manner to render the underside area
     vermin proof
9.   There must be no electrical reticulation system carrying electricity in excess of 24 volts
     beyond the revetment wall unless all switches and power outlets are positioned above
     the 1%AEP flood level.
Log in to download the original file

Court Judgement 17 March 2021 - Case D186 of 2019.pdf · 1.6 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.