Court Judgement 17 March 2021 - Case D186 of 2019
10. Lighting associated with the use must be designed, installed, operated, and maintained
in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor
Lighting.
11. Wastewater and sullage must only be disposed of at approved pumpout facilities.
12. The mooring facility must not be utilised for live-aboard purposes.
13. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act
EPA (1994) and the Environmental Protection (Water) Policy 2009.
14. Certification by a Registered Professional Engineer of Queensland that states that the
jetty extension and pontoon are constructed in accordance with best practice methods
and are structurally sound must be submitted to Council. This certification must be
submitted to Council within three (3) months of the completion of the works. A final
inspection and approval of the structure by Council’s Inspector is also required. Please
contact Council’s Planning Assessment Section (Development Audit & Response Officer
0428738563) to arrange the inspection.
15. This approval lapses where the construction of the jetty extension and pontoon have not
commenced within two (2) years of the date of issue of the approval, unless application
is made and approved by Council for an extension.
16. After completion, the proposed works must be maintained in a sound state of repair in
accordance with the approved plans
17. All necessary State government approvals relating to this development must be obtained
prior to any works commencing on the site
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.