Council archive · source document
07/2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published] · 132007.2238
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
State-controlled road matters 2. The application involves: {tick applicable box/es}
oo mare nomen wee eee oor C) devetopment on land contiguous’ to a State controlled road and for -
ou answered “noni e “to 02, . ; .
the apptcaton riggers referral to the Department (1 (a) material change of use assessable against the planning scheme;
of Main Reads saieepevenlaneatieh - [2] (b) reconfiguring a fot unless -
srency wile Father aleunsoncee DMR wi « the total number of lots is not increased; and —
be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased;
Schedule 2a he IF Regulation vil assist you to (1 (¢) operational work (not associated with a material change of use assessable against the
concurrence agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above)—
* associated with access to a State-controlled road; or
« for filling or excavation; or
¢ involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
C1 (ii) development on land not contiguous to a State-controlled road and -
(1 (a) material change of use -
« assessable against the local government's planning scheme; and
¢ mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
CO (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
(1 (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above)-
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
Ld (iii) none of the above
Clearing vegetation 3. The application involves: (tick applicable box/es)
For mora information refer to Guide 12, ® (i) material change of use -
Unless you answered ‘none of the above" to Q3, : . .
the appcaton requires assessment by the {a) assessable against the planning scheme;
agpunontof Mea Resour and Wait (b) on alot containing -
(NRW). :
itan agency other than NRW is the assessment sa category 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRWisa « if there is no property map of assessable vegetation for the lot - remnant vegetation;
Ganeurrenee agency forthe appication in relation (c) where the existing use of the land is a rural or environmental use; and
Ifyou ticked Q3()) or (ii), your application requires (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
Teferral to NRW for assessment regardless of C1 (ii) reconfiguring a lot -
whether vegelation clearing is proposed or not. _
(a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
(iii) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1
Ed (iv) none of the above.
Strategic port land 4. The application involves:
For more information refer to Guide 11,
If you ticked (i) - the relevant Port Authority is the
assessment manager fos the application.
Hf you ticked (ii) Queensland Transportis a
concurrence agency for the application.
(CJ (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
Act} - complete Part | of Form 1
C1 (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part ! of Form 1
EX (ili) none of the above
4 Land contiguous to a State-controlted road is defined in schedule 14 of the IP Regulation to mean tand - if part of the land is within 100m of the State-controlled road, or that is part of a future State-
controlled road.
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.