Council archive · source document
07/2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published] · 132007.2238
INTEGRATED PLANNING ACT 1997
Acid sulfate soils
For more information refer to Guide 10.
Unless you answered ‘none of the above" to 05,
the application requires assessment by
Department of Natural Resources and Water
(NRW).
If an agency other than NRW is the assessment
manager for the application, NRW is an advice
agency for the application in relation to this
matter.
IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves development on land situated in an identified5 local government area
and where the surface of the land is: (tick appficable box)
C1 (i) betow 20m AHDS and the development will involve the excavation of 1000m3or more of
soil or sediment at or below 5m AHO, or
Li) at or below 5m AHD and the development will involve filling the site with 1000m? or more
of material
X (iii) none of the above
Major hazard facilities or possible
major hazard facilities
For more information refer to Guide 17.
tf you answered "YES" to 06, the application
requires assessment by the Department of
Ememency Services (DES).
if an agency other than DES is the assessment
Manager for the application, DES is a
concurrence agency for the application in
relation to this matter.
Water related development under the
Water Act 2000
For more information about items (a) ~ (f}, refer
to Guide 15. For more information about item
(g), refer to Guide 14 Does my appfication
involve assessment of a referable dam?
Uniess you answered “none of the above” to Q7,
the application requires assessment by the
Department of Natural Resources and Water
(NRW).
lf an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
telation to this matter.
Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
INO
(CI YES - complete Part L of Form 1
The application involves:
C(I) operational work, for taking or interfering with water under the Water Act 2000, that is:
(tick applicable box/es)
( (a) ina watercourse, lake or spring, (eg. a pump, gravity diversion, stream re-direction, weir or
dam) - complete Part Kz, K3, Ks, Ke, or Ka of Form 1 whichever is applicable;
(1 (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
K; of Form 1;
C1 (c) for a subartesian bore, in declared subartesian area’, or in a certain area covered
by a water resource plan, for use for purposes other than stock and/or domestic
US€ - complete Part K; of Form 1;
(1 (d) for a subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part K; of Form 1;
C1 (e) for taking overland flow water in certain areas covered by a water resource plan
— complete Part Ks of Form 1;
(1 (f) for interfering with overland flow water in a drainage and embankment area -
complete Part Kio of Form 1
(1 (g) for constructing a referable dam? or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; or
[1 (ii) none of the above.
Removal of quarry material from a
watercourse
For more information refer to Guide 16.
If you answered “YES” to Q8, the application
requires assessment by the Department of
Natural Resources and Water (NRW).
Kf an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.
Note: Part G of Form 1 is required to be
completed as the activity of removing quarry
material from a watercourse is also an
Environmentatly Relevant Activity (ERA).
Does the application involve development for the removal of quarry material from a watercourse?
requiring an allocation notice under the Water Act 2000?
x] NO
(YES - complete Parts Kr and G of Form 1
5 The identified tocal government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cootoola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsvilte, Whitsunday.
Australian Height Datum {AHD).
Referable dam is defined under the Water Act 2000.
Watercourse is defined in sch 10 of the IPA.
wanD
The declared ground water areas are fisted in Guide 13 Development in a deciared catchment area.
Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.