Council archive · source document
07/2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published] · 132007.2238
on DALY MCU for Noosa South, Lot 15 on SP177649 INTERNATIONAL 6.4. SITECONTAMINATION A search of the registers administered by the Environmental Protection Agency of Queensland has established that the site is not included on either the Contaminated Land Register (CLR). The site is included in the Environmental Management Register (EMR}, as the site is subject to a notifiable activity pursuant to section 374 of the Environmental Protection Act 1994. The site has been subject to operating a defence establishment or a training area used for handling ammunition in a way that may have caused, or may cause, remnant unexploded ordnance. Advice has been sort regarding the above issue from Bactec SE Asia Pty Ltd (DoE approved) who will be engaged to undertake any work that may be required in the construction phase of the proposed development. The proposed construction and ongoing operation telecommunication facility will not generate any solid or liquid waste that could contaminate the site. 65 VISUAL AMENITY In order to achieve its desired coverage in the area, Telstra needs to sufficiently elevate its antennas above physical obstructions, including the adjacent trees. The adjacent trees are approximately 20m in height, therefore the structure will have to be higher than the trees to allow for the tilt on the antennas and also the potential for the trees to grow. Telstra proposes to minimise potential impacts of the proposed facility on the visual amenity of the site and surrounding area by locating the proposed facility within mature trees which will screen the majority of the tower. The tower and antennas will be painted an appropriate colour to blend into vegetated area. Views of the site are limited from the surrounding area due to the surrounding topography and dense tree coverage close to the site. 6.6 STORMWATER DRAINAGE There will not be any need for a stormwater drainage system following construction of the proposed facility, as it has a small “foot print” area. Nonetheless, the Telstra installation will be designed to further minimise any impact upon the existing on-site drainage. The equipment shelter will be raised on piers so as to not create an impediment that would change stormwater flows and allow rainwater to dissipate evenly over the site compound area. 67 NOISE AND VIBRATION EMISSIONS Noise generated during the construction phase will be of short duration and will be in accordance with the standards outlined in the Environmental Protection Regulation 1998 and Environmental Protection (Noise) Policy 1997. 31/10/07 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.