Skip to the record
The gold standard in government transparency.

Council archive · source document

07/2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published] · 132007.2238

of 104

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

_ DALY

MCU for Noosa South, Lot 15 on SP177649 INTERNATIONAL

 

There will be some low level! noise from the on-going operation of air-conditioning
equipment associated with the equipment shelter once installed. Noise emanating from
the air-conditioning equipment would be similar to those used in domestic situations, and
will generally accord with the background noise levels given in Australian Standard AS
1055.

68 TRAFFIC, ACCESS AND PARKING

During the construction phase, a truck will be used to deliver the equipment and a crane
will be utilised to lift most of the equipment into place. Traffic impacts associated with
these vehicles will be of a short-term duration and is not anticipated to adversely impact
upon the surrounding road network.

Once the proposed Telstra facility is operational, there will be minimal traffic generated by
the site. The maintenance requirements of the proposed Telstra facility will include
maintenance activities on an “as-required”" basis. In conclusion, this development is a
minimal traffic generator and will not require on-site parking.

69 UTILITY SERVICES

There will be no adverse environmental impacts by supplying power to the site. The power
to the site will be provided from the existing power sources on off Leslie Road by cable to
the telecommunication facility. Refer to Appendix A plans.

6.10 PUBLIC HEALTH AND SAFETY

All Telstra facility installations are designed and certified by qualified professional engineers
and are in accordance with all relevant Australian Standards. This ensures that the
proposed Telstra facility does not result in any increase in the level of risk to the public.

Telstra operates the facility in compliance with the ACMA mandatory standard, for human
exposure to EME - currently the Radiocommunications {Electromagnetic Radiation -
Human Exposure} Standard 2003. Appendix F shows that the predicted EME will be 0.1% of
the ACMA mandated exposure limit.

The proposed facility will have warning/restrictive access signs aimed at preventing public
access, including a green 2.3 m high secured compound fence.

6.11 STATEMENT IN RELATION TO THE REMOVAL OF REDUNDANT FACILITIES

In the event of the Telstra facility becoming redundant to their requirements, the facility
would be removed. Telstra would ensure that the site is left in a similar condition to that
when their facility was first installed.

 

31/10/07 23

Used in these records

About this file

File size
5.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published].pdf · 5.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.