Skip to the record
Search everything, all in one place.

Council archive · source document

07/2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published] · 132007.2238

of 104

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

D R L EME Precautionary Approach Checklist — Noosa South gels tra

INTERNATIONAL

 

 

 

lissue|Date:) 30/10/07

Land off Noosa Springs Drive, Noosa Heads, Qid
oa] NSA: 4567008

 

Peete The proposed facility consists of the installation of 30m monopole with turret mounting, 6 no. antennas (each 2.63m long) (to a level of 32.9m
Infrastructure to the centre line of the antennas).

One equipment shelter (2.28m x 3.28m x 3.0 High) to be located in a 63m? compound area, to house electronic equipment associated with the
antennas.

Associated ancillary works including mounting methods, new cable trays, low-noise amplifiers, cabling, safe access, earthing, electrical and
air-conditioning works at the proposed telecommunications facility.

5.1 Application of Precautionary Approach to Site Selection — Additional Consideration Items

Section | ACIF Code Requirement : Comments
No |; For each site the Carrier have regard to:

The reasonable service objectives of the carrier including: (i) This facility is intended to provide WCDMA850 coverage to the Noosa Heads

(i) the area the planned service must cover and Noosa Springs including adjacent Gold Course.

(ii) power levels needed to provide quality of service

(iii) the amount of usage the planned service must handle (ii) The transmit power settings at this facility will be set to accomplish the
desired coverage, capacity and call quality within the areas listed above.
The Over the Air specifications provide for the ability for the facility to
reduce the transmitting power to each user based on the radio environment.

 

 

 

 

 

Used in these records

About this file

File size
5.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published].pdf · 5.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.