Skip to the record
For the highest quality transcripts.

Council archive · source document

07/2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published] · 132007.2238

of 104

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

5p @ ®
DALY EME Precautionary Approach Checklist — Noosa South Gels ura

 

 

 

 

 

 

INTERNATIONAL

5.1.4 (b) Minimisation of EME exposure to the public This facility is designed and will be installed in accordance with Telstra Document
005486 to restrict public access to any areas that exceed the general public EME
exposure limits.
The environmental EME level is minimised through the radio network design and
reducing the transmit power to each user based on the radio environment

5.1.4 (c) The likelihood of an area being a community sensitive location The site is not considered to be a community sensitive location, not located close to
schools, hospital, etc

5.1.4 (d) The objective of avoiding community sensitive locations The site has been selected as to provide the required network coverage, whilst being

in an area that screens the majority of the proposed development.

 

 

 

 

 

 

 

5.1.4 (e) Relevant state and local government telecommunications The proposal has been reviewed against State and Local environmental planning
planning policies instruments. The proposal is considered an appropriate use against the relevant
instruments.
5.1.4 (f) The outcomes of consultation processes with Councils and No consultation has been carried out, however impact Assessable application will
communities as set out in Section 5.5 require consultation to take place.
5.1.4 (g) The heritage significance (built, cultural and natural) This site is not considered to have any heritage, cultural or natural significance.
5.1.4 (h) The physical characteristics of the locality including elevation The physical characteristics of this site have been considered during the site

 

 

 

 

and terrain selection and design of this facility. Factors considered included terrain, site

 

 

 

Used in these records

About this file

File size
5.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published].pdf · 5.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.