Skip to the record
Accept no imitations.

Council archive · source document

07/2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published] · 132007.2238

of 104

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

= D ° e
DALY EME Precautionary Approach Checklist — Noosa South elstr @

 

 

 

 

 

 

 

 

 

INTERNATIONAL
elevation and the height of the surrounding obstacles. Radio propagation analysis
indicates that selecting the appropriate antenna tilts will meet the requirements for
coverage from this facility.

5.1.4 (i) The availability of land and public utilities The use of the existing facility represents an appropriate use of an existing
telecommunications site. The further availability of land and public utilities is
inconsequential.

5.1.4 (j) The availability of transmission to connect the Transmission will be via the existing Telstra radio communications fibre

radiocommunications infrastructure with the rest of the network,
e.g. line of sight for microwave transmission

5.1.4 (k) The radiofrequency interference the planned service may cause to
other services No interference issues expected.

5.1.4 (I) The radiofrequency interference the planned service could Radio propagation analysis has been used to ensure the new facility can be
experience at that location from other services or sources of integrated with the existing network while minimising the interference to the new
radio emissions facility.

The Telstra Mobile Network is licensed for the exclusive use of sub bands of
WCDMA 850 frequency bands. Any ACMA approved equipment operating outside
these sub bands will not cause interference to the Telstra Mobile Network. Telstra
will promptly investigate any interference issues that are reported.

5.1.4 (m) Any obligations, and opportunities, to co-locate facilities There are no existing telecommunications structures in the area and no suitable
structures to host telecommunications facilities.

 

 

 

 

 

 

 

Used in these records

About this file

File size
5.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published].pdf · 5.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.