Skip to the record
Every meeting, every word.

Council archive · source document

07/2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published] · 132007.2238

of 104

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

DA L EME Precautionary Approach Checklist — Noosa som Selstr Qi

INTERNATIONAL

; yee Application of Precautionary Approach to Infrastructure Design — EME Precautionary Approach Checklist

Section ACIF Code Requirement | Comments
No i For each site the Carrier have regard to:

 

 

5.2.3 (a) The reason for the installation of the infrastructure considering — This facility is intended to provide WCDMA850 coverage to the Noosa Heads and
coverage, capacity and quality Noosa Springs.

5.2.3 (b) The positioning of antennas to minimise obstruction of Antennas are positioned so that wherever possible a clear line-of-sight can be
radio signals achieved to the target area of coverage. This location meets the objectives outlined

in Section No 5.2.3 (a).

 

5.2.3 (c) The objective of restricting access to areas where RF exposure This facility is designed and will be installed in accordance with Telstra Document
may exceed limits of the EME standard 005486 to restrict public access to any areas that exceed the general public EME
exposure limits.

 

5.2.3 (d) The type and features of the infrastructure that are required to This facility consists of macro utilising directional antennas to meet the objectives
meet service needs including: outlined in Section No 5.2.3 (a).

(i) the need for macro, micro or pico cells; and
(ii) the need for directional or non-directional antennas

 

5.2.3 (e) The objective of minimising power whilst meeting service The transmit power settings at this facility will be set to accomplish the desired
objectives coverage, capacity and call quality within the areas listed in 5.2.3 (a). The Over the

 

 

 

 

 

 

Used in these records

About this file

File size
5.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published].pdf · 5.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.