Council archive · source document
07/2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published] · 132007.2238
: DY ° ° Ist D Y L EME Precautionary Approach Checklist — Noosa South © S Fal INTERNATIONAL Air specifications provide for the ability for the facility to reduce the transmitting power to each user based on the radio environment. 5.2.3 (f) Whether the costs of achieving this objective are reasonable Telstra has under taken preliminary costing of this facility and are of the opinion these costs are reasonable. 5.2.5 If the radiocommunications infrastructure is associated with a base | An EME Assessment has been undertaken in accordance with the ARPANSA station used for the supply of public mobile telecommunications prediction methodology and report format. The assessment has confirmed that the services, site EME assessments must be made in accordance with | EME emission will be in compliance with the ACMA EME regulatory arrangements. the ARPANSA prediction methodology and report format.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.