Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

07/2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published] · 132007.2238

of 104

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

: DY ° ° Ist
D Y L EME Precautionary Approach Checklist — Noosa South © S Fal

 

 

 

INTERNATIONAL
Air specifications provide for the ability for the facility to reduce the transmitting
power to each user based on the radio environment.

5.2.3 (f) Whether the costs of achieving this objective are reasonable Telstra has under taken preliminary costing of this facility and are of the opinion

these costs are reasonable.

5.2.5 If the radiocommunications infrastructure is associated with a base | An EME Assessment has been undertaken in accordance with the ARPANSA
station used for the supply of public mobile telecommunications prediction methodology and report format. The assessment has confirmed that the
services, site EME assessments must be made in accordance with | EME emission will be in compliance with the ACMA EME regulatory arrangements.
the ARPANSA prediction methodology and report format.

 

 

 

 

 

 

Used in these records

About this file

File size
5.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published].pdf · 5.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.