07/2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published] · 132007.2238
Table 14-17 — For all Infrastructure Uses
Column 1
Specific Outcomes
Location and siting
O1 The location and siting of Infrastructure
Uses—
a) maximises accessibility for maintenance
purposes; and
b) does not disrupt @CCés5 for other purposes
Separation from incompatible uses
O2 Sufficient separation distance is provided
between Infrastructure Uses and incompatible
uses on the same S/fe and neighbouring premises
to maintain amenity for neighbouring uses.
O3 Vehicular access to the s/te of the
Infrastructure Use does not adversely impact on
residential amenity.
Column 2
Probable Solutions (if Code Assessable)
$1.1 For Installations and Towers, where
practicable, infrastructure is —
a) co-located with existing Infrastructure Uses; or
b) located on or within an existing building;
AND
$1.2 Easements for 2ccess to
Infrastructure Uses are granted to the Council or
the beneficiary of the easement to ensure suitable
aCCEeSS can be gained, where practicable.
No solution provided
$3.1. Vehicle access to the infrastructure is
gained from roads other than local
residential streets to maintain residential amenity.
Column 3
How does the proposal comply with Probable
Solutions and Specific Outcomes
PS 1 — Acceptable
A search of the area revealed that there were no
suitable structures or existing telecommunications
mast suitable for a new facility. The waste treatment
works has been discounted as redevelopment and
underground infrastructure would prevent the build of
a monopole structure.
An access road already exists.
PS2 - Acceptable
Although the site is not industrial the subject site has
been selected as to provide a good separation
between the proposed telecommunications site and
nearby housing. The closest house is approx. 190m
away from the subject and does not have direct views
over the site due to the topography and existing
vegetation in the area.
PS3 — Acceptable
Following the construction of the proposal
development the site will have only 4 vehicle
movement into and out of the site pera year. The
proposed development will not have a traffic impact.
Building siting and design
04 The siting and design of bui/dings or other
structures reflects and is compatible with the
setting and character of the locality in which the
No solution provided
—
—_—|
PS4 — Acceptable
The proposed telecommunications facility is a slim
pole type which will be painted an appropriate colour
to blend in and reduce the impact of the development
on the amenity of the area.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.