07/2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published] · 132007.2238
Infrastructure Use is located, including the use of
sympathetic colour schemes.
Safety and security
O5 Infrastructure Uses are secure and potential
impacts from vandalism are minimised.
Artificial lighting
O06 The generation of spill light by development,
which gives rise to annoyance, discomfort,
distraction or a reduction in the ability to see
essential information, is avoided.
$5.1 For Installations and Towers—the use is
fenced with security fencing;
$5.2 For other Infrastructure Uses—no probable
solution
$6.1 Lighting associated with the use is
designed, installed, operated and
maintained in accordance with Section 3 of
AS4282 The Control of the Obtrusive Effects
of Outdoor Lighting
PS5 — Acceptable
The proposed compound area will be surrounded be
a secure man proof fence to prevent unauthorised
access and vandalism.
PS6 ~ Acceptable
There will be no associated fighting with the proposed
development.
Mechanical plant and equipment
07 Mechanical plant and equipment (including air
conditioning equipment) are—
a) positioned to minimise adverse impacts on
the amenity of any residential premises;
b) designed and positioned to visually integrate
with the building and roof design; and
c) appropriately screened.
Environment & heritage values
O8 There are no significant adverse effects on
the biodiversity, natural vegetation, native wildlife,
habitats, landscape quality, water quality or heritage
values, including those related to—
i) changes to natural drainage;
j) disturbance to any of the wet/and systems;
k) management of landstide and fire risk;
|) erosion and the transport of sediments offsite;
m) unmanaged public access,
n) effluent disposal11;
0) changes to fauna habitat and behaviour; and
p) disturbance of buildings and features, including
natural features, of heritage significance.
$7.1 Plant and equipment are—
a) located more than 2m from any property boundary;
and
b) screened by dense vegetation or fencing (i.e.
1.5m wide vegetated buffer area),
OR
$7.2 Plant and equipment are located within a
building.
No solution provided
Advisory note
PSP24 ~ Effluent Disposal details
equirements for the design and siting of effluent
disposal systems where located outside a sewerage
ervice ared,
Compliance with PSP24 will be considered as part of
Council's assessment of the plumbing and drainage
application,
———_—}
PS7 - Acceptable
The site is about 200m away from the closet
residential property; therefore the noise impact form
air-conditioning will not be audible.
The current vegetation surrounding the site will
screen views of the compound from outside of the
site.
PS8 - Acceptable
The location of the proposed telecommunications
tower has been selected as to cause not harm to the
biodiversity, natural vegetation, native wildlife or
landscape quality.
The proposed compound area is located on
previously disturbed land, and therefore there will be
no need to remove any vegetation or lop or cut back
any trees.
The proposed compound area is located on
previously cleared land and no vegetation will need
to be removed or cut back.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.