Council archive · source document
07/2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published] · 132007.2238
x
1
INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006
Land owner's consent (if applicable) 20. Land owner's consent to the making of this application:
Section 3.2.1(3) of the IPA prescribes that an , 7
application must contain, or be supported by, the Name a a _Ssiesature Date
written consent of the land owner's, if the application . . . 7
involves: (i) | Noosa Shire Council
() amateridchangeofuse, Pee eee eek
{i} reconfiguration of a lot; a
{fi) work on land below high-water mark & not within a (i)
canal as defined under the Coastal Protection and | | __ een eee ee ceeeeen ee fone e nee e eee
Management Act 1995;0° -
((v) work on rail corridor land defined under the {iii)
Transport Infrastructure Act 1994. feelin eee eee eee beeen eee eee eee eee eee eee eee e lene eeeneeceee
Section 3.8.1(2}{a) of the IPA provides that .
landowner's consent is not required for a mobile or (iv)
temporaryERA, fl nw nnn nn nnn nnn nn ee ee eee eee eee ee eee eee fee eee ee een eee eee fee eee eee eee
For more information refer to Guide 1, (v)
Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
Section 3,2, 1(5) of the IPA requires evidence of quarry material on State coastal fand under the Coastal Protection and Management Act 1995)?
resource entittement be given for applications that oS
involve a prescribed State resource. NO -go to 024 (YES - goto a22
Section 3.2.1(10}(2)i) of the PA prescribes that an se me nieetine 4 . .
Se ee breach reas” |22. This application is accompanied by evidence: (ick applicable box)
without evidence of the resource entitlement. F 3 o .
i) of the allocation of, or entitlem -
ies foreevnleting at & 22 oO allocation of, or entitlement to, the resource - attach evidence and go to Q23(v)
Refer to schedute 10 of the Integrated Planning C1 (ii) the chief executive of the department administering the resource is satisfied the
Regutation 1998 that prescribes the nature of evidence development is consistent with an allocation of, or entitlement to, the resource - go
required by the State in support of the lodging of this
development application. to Q23
LO (ili) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource - go to Q23
Advice for completing 023 23. Evidence of the resource entitlement:
The information in (i) ~ (v} is mandatory if evidence is
required under 022 (i) or (i) above. (i) Resource entitlement / authority details (vii) Official stamp of the department
The official stamp of the Department of Natural administering the resource (if
Resources, Mines and Water is mandatory where the applicable)
application involves any water or riverine quarry {ii) Name of delegated officer
Section 3,2.1(5A) allows ihe resource manage? to fit
the time the evidence mi used. (vi) must iii ti
compiled the evidences ime ted (i) Position of delegated officer
(iv) Signature of delegated officer
(v) Date
(vi) ee date of evidence a
Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?
: , , cat -
thecanplaon of Pa ae Bolte Form zak it ° XK YES oO NO - the assessment manager may refuse to accept this application on the
must be completed for all other applications. grounds that the application has not been property made
Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:
An application should be accompanied by details to . "
support the proposal & enable the assessment Plan / Drawing / Report Number Title Date
manager, referral agencies and any person viewing 7 . .
the application during public scrutiny or public (i) —Q107632-S1 Site Locality & Access Plan July 07
notification to understand the scope of the proposal | f= oo on nn nnn nnn n nnn nanan eee seen nee eee nnn wen ee nn nnn nnn
and any potential impact. Q107632-S2 Site Layout July 07
{iv} Q107632-G1 Lease Layout July 07
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.
OFFICE USE ONLY (applicable to assessment manager's) _
res) FETS | RECEIVED | 2/t) 0? [eww Ps Rroe os | NUMBERS lor/z 23 e |
Notification of Engagement of Private Certifier (Optional format —
To Council. | have been engaged as the private certifier for the building work referred to in this application.
Date ofengagement| / / Accreditation Number. _— Name: Signature:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.