Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

07/2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published] · 132007.2238

of 104

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

Part D, Version 2.0, 4 October 2004

Form 1 Development Application

Material change of use

assessable against a local government’s planning scheme

 

“2

PARE

r—- -

¥

a)

C
Se

 

Completion of all applicable questions on Part D is mandatory for all applications involving assessment of a
material change of use (MCU) assessable against a local governments planning scheme.

 

Nature of the application

A development permit authorises
development to occur, while a preliminary
approval is a step in the approval process

and does not authorise development to occur.

1.

This application is for: (tick 1 or both if applicable)

XJ Preliminary approval for a material change of use of premises including conceptual

design for any associated works that require approval under the planning scheme (ie.
consideration of the proposal concep!)

AND /OR

LJ Development permit for a material change of use of premises including conceptual
design for any associated works that require approval under the planning scheme.

 

 

 

 

 

 

 

 

 

 

 

 

 

The subject land 2, How the subject land is identified in the planning scheme (name the zone, precinct etc.)
For the definition of “gross floor area” go to
the planning scheme against which the [Noosa Plan 2006
application will be assessed.
3. _ Existing gross floor area: (if applicable) 66msq |
4. Are there any existing easements on the land?
[NO
(YES - attach plans of the location and details of the purpose of the easement
Material change of use details 5. _ Details of the change to the use of the land: (eg. vacant tand to shopping centre, house to apartment building,
vacant fand to industry (tyre manufacturing) etc.)
| Vacant Land to Telecommunications Tower |
§. Number of employees: [0 |
7. Operating days and hours: [ 7days 24 hours
Associated building works details (f 19 Site cover: NIA
applicable)
For the definition of “site cover’, “gross floor 9. Gross floor area: NIA

area” and “storey” go to the planning scheme
against which the application will be

 

 

 

 

 

aesessed. 10. Number of on-site car parking spaces: [ N/A |
11. Number of storeys / maximum height above natural ground: N/A
12. Number of employees N/A
13. Hours and days the use will operate [NIA |
Associated operational works details | 14. Details of associated operational works (eg. landscaping, cut and fi drainage, road works etc.)

(it applicable}

 

 

[Na |

PLEASE NOTE

This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information

requested by Part A and any other relevant part of Form 1.

 

OFF ICE USE ONLY {applicable to assessment manager)

 

L DATE RECEIVED

 

REFERENCE
NUMBER/S

 

 

od

 

Used in these records

About this file

File size
5.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published].pdf · 5.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.