EARTHWORKS CODE
Performance Criteria and Acceptable Solution
Noosa Civic Stage 2 Retail Development
29 September 2023
          PERFORMANCE OUTCOMES                                                ACCEPTABLE OUTCOMES                                                      RESPONSE
 Local amenity

 PO4                                                         AO4.1                                                                  Development will comply with the requirements of the
 Earthworks do not cause disturbance to the                  The following control measures are implemented—                        Acceptable Outcome with regards to dust control and
 amenity of the neighbouring land.                           a) regular water spraying of exposed areas to suppress                 Earthworks operation hours
                                                                  dust;

                                                             b)    provision of dust stabilised or sealed internal roads


                                                             c)    protective covering of exposed areas that are left for
                                                                   more than 2 weeks; and

                                                             d)    if there is no valid development permit for the site,
                                                                   disturbed areas are revegetated using species
                                                                   identified in PSP3 - Landscaping Plants and
                                                                   Guidelines;

                                                             AND

                                                             AO4.2
                                                             Earthworks are undertaken only during
                                                             the hours of 7am to 6pm, Monday to Friday and 7am to
                                                             6pm on Saturday. No work is undertaken on Sunday or
                                                             public holidays.




  https://mpncnetau.sharepoint.com/sites/administration/shared documents/9000-9999/9900-9999/9954/codes/29-09-23 earthworks code.docx

Used in these records

About this file

File size
16.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix C- Civil Engineering Report.pdf · 16.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.