Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Appendix C- Civil Engineering Report · MCU23/0135

of 75

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 58, section 1. The text section number identifies this passage in the reader.

EARTHWORKS CODE
Performance Criteria and Acceptable Solution
Noosa Civic Stage 2 Retail Development
29 September 2023
          PERFORMANCE OUTCOMES                                                ACCEPTABLE OUTCOMES                                                          RESPONSE

 Vegetative Waste

 PO5                                                         AO5.1                                                                  Any tree removal will comply with the requirements of
 Vegetation cleared from a development site is               Cleared vegetation is transported off-site for disposal in             the planning scheme.
 disposed of in an environmentally responsible               an approved green waste disposal facility;
 manner.                                                     OR
                                                             AO5.2
                                                             Cleared vegetation is mulched on-site and reused for
                                                             landscaping of the finished
                                                             development;
                                                             OR
                                                             AO5.3
                                                             Cleared vegetation is disposed of for the purpose of
                                                             firewood. (Note: Disposal of vegetative waste by burning
                                                             off is not an acceptable method of disposal).
 Managing contamination risk

 PO6                                                         AO6.1                                                                  All fill material used on site will be clean fill.
 Materials used as fill are suitable for development         The fill material is solid clean earth, free of putrescible or         The site is not on the contaminated lands register
 of the land and filling or excavation works do not          refuse material, vegetation, acid sulfate soils, building or
 result in the contamination of land.                        construction material or other material or contaminants;

                                                             AND
                                                             AO6.2
                                                             The site is not on the contaminated land register.




  https://mpncnetau.sharepoint.com/sites/administration/shared documents/9000-9999/9900-9999/9954/codes/29-09-23 earthworks code.docx

Used in these records

About this file

File size
16.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix C- Civil Engineering Report.pdf · 16.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.