Skip to the record
Accept no imitations.

Council archive · source document

Appendix C- Civil Engineering Report · MCU23/0135

of 75

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 60, section 1. The text section number identifies this passage in the reader.

EARTHWORKS CODE
Performance Criteria and Acceptable Solution
Noosa Civic Stage 2 Retail Development
29 September 2023
              PERFORMANCE OUTCOMES                                                ACCEPTABLE OUTCOMES                                                       RESPONSE

 Dams

 PO11                                                            AO11.1                                                                 Not Applicable. No dams constructed as part of
 Dam location and construction does not impact                   Where the site is in the Rural Zone— a) the land has a                 development
 upon neighbouring properties in terms of—                       slope of less than 25%
 a)       hydrology;                                                  (1:4); and
 b)       alteration of existing overland flowpaths and          b)    the earthworks including cut and fill batters and
          patterns;                                                    retaining walls are setback a minimum of 50m from
 c)       landslide or failure of dam wall; and                        the property boundary; and
 effluent disposal areas.                                        c)    the size of the lot is greater than 5 hectares;
                                                                 AND
                                                                 AO11.2
                                                                 Where the site is in the Rural Settlement Zone or the
                                                                 Rural Zone where the lot is less than 5 hectares—
                                                                 a) the land has a slope of less than 1:6; and
                                                                 b)    the earthworks including cut and fill batters and
                                                                       retaining walls are setback a minimum of 20m from
                                                                       the property boundary; and
                                                                 c)    involving less than 500m3 of material;
                                                                 AND
                                                                 AO11.3
                                                                 For all other zones — No solution provided.




      https://mpncnetau.sharepoint.com/sites/administration/shared documents/9000-9999/9900-9999/9954/codes/29-09-23 earthworks code.docx

Used in these records

About this file

File size
16.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix C- Civil Engineering Report.pdf · 16.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.