Appendix C- Civil Engineering Report · MCU23/0135

of 75

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 59, section 1. The text section number identifies this passage in the reader.

EARTHWORKS CODE
Performance Criteria and Acceptable Solution
Noosa Civic Stage 2 Retail Development
29 September 2023
          PERFROMANCE OUTCOMES                                                ACCEPTABLE OUTCOMES                                                        RESPONSE

 Haulage activity and amenity

 PO7                                                         AO7                                                                    Development will comply with the haulage
 Haulage of material to and from a site ensures—             No solution provided                                                   requirements
 a) minimal disturbance to neighbouring
    properties and properties along the haulage
    route; and
    b) Council’s road infrastructure including
    pavements is not adversely affected.
 Extent of earthworks

 PO8                                                         AO8                                                                    All earthworks and retaining are contained within the
 Earthworks are contained within the subject                 All earthworks, including cut and fill batters, retaining walls        development site
 property.                                                   etc are contained within the subject site.


 Sloping sites

 PO9                                                          AO9                                                                   Not Applicable. Site is not sloping
 On sloping sites, excavation or filling are designed        Cut or fill is less than 2m in depth relative to the natural
 to maximise the use of natural slope and minimise           ground surface.
 the need for cut and fill.
 Environmental protection

 PO10                                                        AO10                                                                   Earthworks will minimise impacts as required by
 Earthworks minimise any adverse impact upon                 No solution provided.                                                  performance criteria.
 groundwater, watercourses, drainage lines,
 wetlands, and native vegetation.




  https://mpncnetau.sharepoint.com/sites/administration/shared documents/9000-9999/9900-9999/9954/codes/29-09-23 earthworks code.docx

Used in these records

About this file

File size
16.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix C- Civil Engineering Report.pdf · 16.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.