Council archive · source document
Rabtuvi Pty Ltd - IDAS Forms · OPW13/0451
[No L] Yes If applicable what is the length of the waterway? e) Removing or interfering with coastal dunes on land, other than State coastal land, that is in an erosion prone area as defined in the Coastal Protection and Management Act 1995 and above high water mark (e.g. lowering dune vegetation on freehold and leasehold land)? No (1 Yes If applicable what is the estimated value of the proposed works? Table B — Material Change of Use a) Does the material change of use involve the following? (Tick the applicable box/es.) O Operational work carried out completely or partly in a coastal management district b) Does the material change of use involve building work carried out completely or partly in a coastal management district that is: CO the construction of new premises with a gross floor area of at least 1000m? CT the enlargement of the gross floor area of existing premises by more than 1000m? Table C — Reconfiguring a Lot a) Does the reconfiguring a lot involve the following? (Tick the applicable box/es.) O Land situated completely or partly in a coastal management district C The construction of a canal b) How many lots will be created? Table D — Building Work a) Is the building work on land completely or partly seaward of the coastal building line under the Coastal Protection and Management Act 1995? O No CJ Yes 2. Is the tidal works located within a local government tidal area? (Tick applicable box/es) ml No [vz] Yes- provide details below Local Government SuncSHiNe Coasqp REG Cone couricin 3 IDAS form 23—Tidal work and coastal management districts Version 2.0 17 December 2012
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Rabtuvi Pty Ltd - IDAS FormsRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.