Council archive · source document
Rabtuvi Pty Ltd - IDAS Forms · OPW13/0451
3. Confirm that the following mandatory supporting information accompanies this application Mandatory information Confirmation of Method of lodgement lodgement For ALL applications Written description of the proposal including a report that addresses any m@ Confirmed relevant state coastal policies. For applications involving operational work that is tidal works A copy of the certificate of title for the land (including tidal land) that A Confirmed would abut or adjoin the proposed works. oO Cot applicable Plans showing: [1 Confirmed e _ the real property description and boundaries of the land (including C1 Not applicable tidal land) that would abut or adjoin the proposed works ® — the proposed works (including existing works to be removed) in relation to relevant tidal planes (e.g. mean high water springs) e the slope angles of the beds and banks of the tidal area and the finished levels of the proposed works . if For tidal work that will occupy a navigable waterway provide a water Confirmed allocation area plan providing evidence that the proposed work will not O N Li prejudice the access rights of adjoining property owners. lot applicable Details of the largest vessel, if any, to be moored at the structure. me Confirmed Oo Not applicable For prescribed tidal works, details of how the proposed work addresses a Confirmed the IDAS code for prescribed tidal work in the Coastal Protection and Oo ; Management Regulation 2003, schedule 4A . Not applicable If applicable, certification that the design of tidal works is suitable for 4 Confirmed intended use, signed by a Registered Professional Engineer of Cl Not applicable Queensland (or equivalent). For applications involving Material Change of Use Plans certified by a registered professional engineer of Queensland EF] Confirmed R i ing: (RPEQ) or a registered surveyor showing Oo Not applicable e the real property description and boundaries of the land e the proposed works in relation to the location of the coastal management district and coastal hazards. For applications involving Reconfiguring a Lot Plans certified by a registered surveyor showing: im Confirmed * — the real property description and boundaries of the land [_] Not applicable ° The location of the coastal management district and coastal hazards in relation to the land being reconfigured e Any land being surrendered as a separate lot on the plan of subdivision. For applications involving building works seaward of a coastal building line 4 IDAS form 23—Tidal work and coastal management districts Version 2.0 17 December 2012
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Rabtuvi Pty Ltd - IDAS FormsRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.