20220237 73 Southern Cross Pde SWMP

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 14, section 1. The text section number identifies this passage in the reader.

                            GENERAL NOTES                                                                        ANDSTOCKPILE ON SITE OR REMOVE FROM SITE AS DIRECTED.                           STRUCTURAL FILL.                                                            REQUIREMENTS OF THE GEOTECHNICAL ENGINEER AS OUTLINED IN THE
                                                                                                             19. DRAWINGS TO BE READ IN CONJUNCTION WITH ARCHITECT, SURVEYOR,               3.   UNSUITABLE NATURAL MATERIALS SUCH AS SATURATED, LOOSE OR                    GEOTECHNICAL INVESTIGATION REPORT BY TECTONIC. TEMPORARY
                            1.    ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN.                     HYDRAULICS, ETC. CONSULTANT AND CONTRACTOR DRAWINGS.                            SOFT MATERIALS ENCOUNTERED SHOULD BE REMOVED DURING                         UNSURCHARGED CUTS IN LOOSE TO VERY LOOSE SAND TO BE FORMED
                                                                                                                                                                                                 SUBGRADE PREPARATION FOR BULK EARTHWORKS. ALL UNSUITABLE                    AT 1V:2H, AND IN MEDIUM DENSE SAND AT 1V:1H FOR BATTERS UP TO
                            2.    ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE                       20. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT                             MATERIAL TO BE REMOVED FROM SITE AT CONTRACTORS EXPENSE.                    3M IN HEIGHT. DEEPER CUTS ARE TO BE ASSESSED BY THE
                                  CONTRACTOR. CONTRACTOR TO ALLOW FOR ALL MEANS NECESSARY                        AUTHORITY: ROAD OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN                                                                                                  GEOTECHNICAL ENGINEER.
                                  TO ACCURATELY SETOUT THE WORKS.                                                FOR ALL WORKS WITHIN COUNCIL ROAD RESERVES. CONTRACTOR TO                  4.   COMPACTION OF THE EXPOSED SAND SUBGRADE REQUIRES
                                                                                                                 ALLOW FOR ALL COSTS ASSOCIATED WITH IMPLEMENTATION OF THE                       SUBSTANTIAL VOLUMES OF WATER COMBINED WITH VIBRATORY                     21. WHERE THE ABOVE TEMPORARY BATTER SLOPES CAN NOT BE
                            3.    ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT                         TMP.                                                                            COMPACTION EQUIPMENT. CARE MUST BE TAKEN TO ENSURE THERE                     ACHIEVED, TEMPORARY SHORING WILL BE REQUIRED UNDER THE
                                  SPECIFICATIONS AND WHERE FURTHER DETAILS ARE REQUIRED THE                                                                                                      ARE NO IMPACTS ON SURROUNDING STRUCTURES. MATERIAL TO BE                     ADVICE OF A SPECIALIST SHORING CONTRACTOR.
                                  CONTRACTOR SHALL REFER TO NOOSA SHIRE COUNCIL DEVELOPMENT                  21. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH ALL LOCAL                          COMPACTED IN ACCORDANCE WITH GEOTECHNICAL REPORT AND
                                  GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES, ASSOCIATED                       AUTHORITY APPROVALS RECEIVED FOR THE PROJECT AND IN                             AS1289.                                                                  22. EXCAVATIONS IN PROXIMITY TO EXISTING STRUCTURES WILL REQUIRE
                                  STANDARD DRAWINGS AND SPECIFICATIONS U.N.O.                                    ACCORDANCE WITH OPW APPROVALS BY COUNCIL.                                                                                                                    SPECIFIC DESIGN TO PREVENT UNDERMINING WHICH SHOULD BE
                                                                                                                                                                                            5.   A MINIMUM 150MM THICK GRANULAR WORKING PLATFORM MAY BE                       CARRIED OUT BY A SUITABLY QUALIFIED AND EXPERIENCED RPEQ
                            4.    SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED                         22. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE                       REQUIRED ON SOIL SUBGRADES ALONG HAUL ROADS AND LAYDOWN                      STRUCTURAL ENGINEER.
                                  OUTSIDE OF THE TOLERANCES SPECIFIED WITHIN THE PROJECT                         BOUNDARY WITHOUT FORMAL APPROVAL BY THE OWNER/CUSTODIAN                         AREAS TO IMPROVE TRAFFICABILITY. SPECIFIC PLATFORM DESIGN
                                  SPECIFICATION AND LOCAL AUTHORITY REQUIREMENTS, THE                            OF THAT LAND INCLUDING BUT NOT LIMITED TO PRIVATE PROPERTY,                     WOULD BE REQUIRED PRIOR TO MOBILISATION AND TRAFFICKING OF               23. CONTRACTOR'S RPEQ GEOTECHNICAL ENGINEER IS TO CONFIRM THAT
                                  CONTRACTOR WILL RECTIFY AT THEIR COST INCLUSIVE OF ANY                         ROAD RESERVE, PARKS/OPENSPACE, EASEMENTS.                                       ANY HEAVY MOBILE PLANT ON THE SITE.                                          ANY CONSTRUCTED CUT/FILL BATTERS AND RETAINING STRUCTURES
                                  ADDITIONAL COSTS INCURRED BY RECOR.                                                                                                                                                                                                         ON THE SITE HAVE ACHIEVED ADEQUATE STABILITY WITH A LONG-TERM
                                                                                                             23. THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION                  6.   IMPORTED GENERAL FILL MATERIAL SHALL BE SUPPLIED AND                         FACTOR OF SAFETY AGAINST GEOTECHNICAL FAILURES TO THEIR
                            5.    EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND                     DRAWINGS AND APPROVALS ON SITE AT ALL TIMES.                                    COMPACTED WHERE UNSUITABLE NATURAL MATERIALS ARE LOCATED                     SATISFACTION.
                                  AS SUCH THEIR ACCURACY CANNOT BE GUARANTEED. NO                                                                                                                AND AS OTHERWISE NECESSARY TO OBTAIN SUBGRADE/PLATFORM
                                  RESPONSIBILITY IS TAKEN BY RECOR OR THE PRINCIPAL FOR THE                                                                                                      LEVEL. IMPORTED GENERAL FILL MATERIAL SHALL BE CLEAN GRADED              24. EARTHWORKS LEVELS SHOWN ARE FINISHED SURFACE LEVELS
                                                                                                             24. ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN
                                  ACCURACY AND COMPLETENESS OF THIS INFORMATION. IT IS THE                                                                                                       MATERIAL FREE OF ORGANIC MATTER AND STONES, WITH MAXIMUM                     INCLUSIVE OF TOPSOIL LAYER. REFER TO STRUCTURAL ENGINEERING
                                                                                                                 ACCORDANCE WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN
                                  RESPONSIBILITY OF THE CONTRACTOR TO ACCURATELY ESTABLISH                                                                                                       PARTICLE SIZE OF 100MM AND CAPABLE OF BEING COMPACTED INTO                   DRAWINGS FOR BUILDING SLAB THICKNESSES AND HYDRAULIC
                                                                                                                 AND CONSTRUCTION CODE (2013).
                                  THE LOCATION AND LEVEL OF ALL EXISTING SERVICES PRIOR THE                                                                                                      COHERENT FILLING TO THE SPECIFIED STANDARD. THE MATERIAL                     DRAWINGS FOR SUB-FLOOR DRAINAGE FOR DETERMINATION OF
                                  COMMENCEMENT OF ANY WORKS. ANY DISCREPANCIES SHALL BE                                                                                                          SHALL HAVE A MAXIMUM PLASTICITY INDEX OF 15%, A SHRINK-SWELL                 REQUIRED BULK EARTHWORKS SURFACE.
                                  REPORTED TO THE SUPERINTENDENT. CONTRACTOR TO LOCATE AND                   STANDARD SIGNS AND LINE MARKING NOTES                                               INDEX OF LESS THAN OR EQUAL TO 1% AND A MINIMUM C.B.R. OF 10%.
                                  PROTECT SERVICES AS REQUIRED DURING PROPOSED WORKS.                        1. GENERAL                                                                                                                                                   25. ANY PRELOADING REQUIRED IS TO OCCUR IN ACCORDANCE WITH THE
                                                                                                               a. ALL SIGNS AND PAVEMENT MARKING IS TO BE IN ACCORDANCE WITH                7.   ALL EARTHWORKS TO BE CARRIED OUT AT +/- 2% OPTIMUM MOISTURE                  GEOTECHNICAL ENGINEERS REQUIREMENTS. CONTRACTOR TO ALLOW
                            6.    THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND                      THE QUEENSLAND TRANSPORT MANUAL OF UNIFORM TRAFFIC                             CONTENT FOR STANDARD COMPACTION.                                             FOR THE IMPORT AND REMOVAL OF ALL NECESSARY MATERIAL TO
                                  SURVEY ALL CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS                       CONTROL DEVICES (CURRENT EDITION).                                                                                                                          UNDERTAKE THE PRELOADING OPERATIONS.
                                  SHOWN ON THE DRAWINGS INCLUDING ANY POTENTIAL EXISTING                                                                                                    8.   ANY PROPOSED RETAINING WALL WORKS MUST BE WHOLLY WITHIN THE
                                                                                                             2. SIGNS
                                  SERVICES CLASHES PRIOR TO COMMENCEMENT OF CIVIL WORKS.                                                                                                         PROPERTY BOUNDARY OF THE SUBJECT SITE, INCLUDING REAR OF
                                                                                                               a. ALL SIGNS TO BE REFLECTORISED CLASS 1 TO AS1906.1:2007 UNLESS                                                                                           26. REFER ARCHITECTURAL DRAWINGS FOR BUILDING SETOUT.
                                  CONTRACTOR TO IMMEDIATELY REPORT ANY DISCREPANCIES TO                                                                                                          RETAINING WALL DRAINAGE INFRASTRUCTURE FOR RETAINING WALLS
                                  RECOR AND AWAIT FORMAL DIRECTION PRIOR TO COMMENCING CIVIL                      NOTED OTHERWISE.
                                                                                                                                                                                                 IN CUT. RETAINING WALLS ARE TO BE PREPARED IN ACCORDANCE WITH
                                  WORKS.                                                                       b. SIGNS ARE TO BE INSTALLED WITH THE FOLLOWING CLEARANCES TO                     STRUCTURAL ENGINEERS SPECIFICATIONS, AND IN CONFORMANCE
                                                                                                                  EDGE OF SIGN: LOCATION CLEARANCE NO KERB 600 BEHIND GUIDE                      WITH CONSTRUCTION REQUIREMENTS OF GEOTECHNICAL REPORT.                   INSPECTIONS:
                            7.    ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS                     POSTS BARRIER KERB 300 FROM FACE MOUNTABLE KERB 500 FROM                                                                                                THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS
                                  SHALL BE RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS,                           FACE OF KERB.                                                             9.   REFER   ARCHITECT/LANDSCAPE     ARCHITECT    DRAWINGS     FOR            BEFORE ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR
                                  FOOTPATHS, CONCRETE AREAS, GRAVEL AREAS, GRASSED AREAS AND                                                                                                     CONFIRMATION OF RETAINING WALL COLOUR AND FINISH.                        IS TO PROVIDE A MINIMUM OF 72 HOURS NOTICE TO RECOR FOR REQUIRED
                                  ROAD PAVEMENTS.                                                              c. PARKING CONTROL SIGNS TO BE MOUNTED TO FACE APPROACHING
                                                                                                                                                                                                                                                                          INSPECTIONS. SHOULD THE CONTRACTOR FAIL TO REQUEST AN
                                                                                                                  TRAFFIC AT 45° TO KERB OR CARRIAGEWAY EDGE. ALL OTHER SIGNS TO                                                                                          INSPECTION, THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS TO
                                                                                                                                                                                            10. ALL EARTHWORKS OPERATIONS SHALL BE CARRIED OUT WITH 'LEVEL 2'
                            8.    CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO                     BE TURNED AWAY BY 5° FROM THE NORMAL TO APPROACHING                                                                                                     ALLOW FOR THE WORKS TO BE INSPECTED TO THE SATISFACTION OF
                                                                                                                                                                                                SOIL ENGINEERING SUPERVISION IN ACCORDANCE WITH APPENDIX B OF
                                  AUTHORITY/COUNCIL'S   INFRASTRUCTURE.  SUCH     REPAIR   OR                     HEADLIGHT.                                                                    AS 3798. THE NOMINATED GEOTECHNICAL TESTING AUTHORITY SHALL               RECOR. ANY INSPECTIONS THAT FAIL ARE TO BE RE-INSPECTED WITH ALL
                                  REINSTATEMENT TO BE CARRIED OUT IMMEDIATELY TO THE                         3. SIGN SUPPORTS                                                                   PROVIDE    CERTIFICATION  THAT    ALL GENERAL    EARTHWORKS               REINSPECTION COSTS TO BE PAID BY THE CONTRACTOR.
                                  SATISFACTION   OF    INFRASTRUCTURE    OWNER/MANAGER       /                 a. SLEEVED SIGNS SUPPORTS ARE TO BE PROVIDED IN ALL AREAS                        OPERATIONS HAVE BEEN CARRIED OUT IN ACCORDANCE WITH THE
                                  AUTHORITY/COUNCIL.                                                                                                                                            DRAWINGS AND SPECIFICATIONS AND THE CONTROLLED FILL IS                     a. PRESTART
                                                                                                                  WHERE THEY ARE IN A PAVED SURFACE.
                                                                                                             4. LINEMARKING                                                                     SUITABLE FOR PURPOSE TO THE REQUIRED BEARING CAPACITY UNDER
                            9.    CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL                     a. REDUNDANT LINEMARKING IS TO BE GROUND OFF.                                    THE PLATFORM/STRUCTURES AS SPECIFIED BY THE GEOTECHNICAL                   b. EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF
                                  WORKPLACE HEALTH AND SAFETY REQUIREMENTS.                                                                                                                     REPORT.                                                                       SEDIMENT AND EROSION CONTROL MEASURES UNSUITABLE GROUND
                                                                                                               b. THERMOPLASTIC LINEMARKING TO BE USED FOR ALL CONCRETE.
                            10. WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN                                                                                                     11. ALL EARTHWORKS FILL AND EXCAVATED AREAS SHALL BE COMPACTED
                                                                                                                                                                                                                                                                           c. SIDE AND CUT OFF DRAINS
                                CLOSE PROXIMITY TO NEIGHBOURING LOT BOUNDARIES OR                            JOINTING NOTES                                                                     TO 98% STANDARD MAXIMUM DRY DENSITY OR A DRY DENSITY INDEX
                                INFRASTRUCTURE, CONTRACTOR TO ALLOW IN SCOPE OF WORKS TO                                                                                                        OF AT LEAST 75% IN ACCORDANCE WITH THE GEOTECHNICAL REPORT
                                PROVIDE ALL MEASURES NECESSARY TO ENSURE THE INTEGRITY OF                    1.   ALL JOINTING AND CONCRETE TO BE IN ACCORDANCE WITH THE                        IN LAYERS OF 250MM LOOSE THICKNESS (PRIOR TO COMPACTION).                  d. STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL
                                EXISTING BOUNDARIES AND INFRASTRUCTURE. THIS MAY INCLUDE THE                      REQUIREMENTS OF AS3727.1:2016.
                                USE OF LOW VIBRATION EQUIPMENT, TRENCH SHORING ETC AS                        2.   SAW CUT JOINTS MUST BE:
                                                                                                                                                                                            12. COMPACTION TESTING TO BE CARRIED OUT AT A MINIMUM OF TWO                   e. STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT
                                REQUIRED.                                                                     a. BETWEEN 1 AND 1 OF CONCRETE PAVEMENT DEPTHS.                                   TESTS PER VERTICAL LIFT WHERE STRUCTURAL FILL HEIGHTS EXCEED
                                                                                                                          4      3                                                              300MM IN ACCORDANCE WITH AS3798. CONTRACTOR TO UNDERTAKE
                                                                                                                                                                                                                                                                           f. STORMWATER STRUCTURE BASE SLABS
                            11. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON                      b. CLEARED OF ANY DEBRIS FROM THE CUTTING METHOD.                                 ALL EARTHWORKS TESTING IN ACCORDANCE WITH GEOTECHNICAL
                                THESE DRAWINGS, THE CONTRACTOR IS TO NOTIFY RECOR AND                                                                                                           ENGINEER AND LOCAL AUTHORITY REQUIREMENTS.
                                                                                                               c. PERFORMED WITHIN 6 TO 12 HOURS OF FINISHING CONCRETE POURS.                                                                                              g. PAVEMENT SUBGRADE
                                RECEIVE WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.
                                                                                                             3. DOWELL BARS MUST BE INSTALLED EXACTLY 90° TO THE FACE OF JOINT
                                                                                                                                                                                            13. FINISHED SURFACES TO ALL DISTURBED AREAS ARE TO BE TREATED IN
                            12. CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL                             TO ALLOW EXPANSION AND CONTRACTION MOVEMENTS.
                                                                                                                                                                                                ACCORDANCE WITH LANDSCAPE DRAWINGS.                                        h. PAVEMENT REINFORCING
                                CONSTRUCTED WORKS IN ACCORDANCE WITH LOCAL GOVERNMENT                        4. JOINTING LAYOUT TO BE CONFIRMED BY SUPERINTENDANT PRIOR TO
                                REQUIREMENTS.  UNLESS   OTHERWISE    ADVISED   BY RECOR                           CONSTRUCTION COMMENCING. LAYOUT SHOULD AVOID ACUTE ANGLES
                                                                                                                  IN THE CONCRETE SLAB AND AVOID MISMATCHED JOINTS.                         14. ALL NEW WORKS TO MATCH NEATLY INTO EXISTING LEVELS.                        i. PAVEMENT PRIOR TO SEALING (PRESEAL)
                                CONTRACTOR TO NOTE COUNCILS ADAC REQUIREMENTS.
                                                                                                             5. JOINT SEALANTS WHERE USED MUST ADHERE TO SIDE OF JOINT FACES
                                                                                                                  ONLY AND SHALL NOT EXTEND ABOVE SIDES OF JOINTS ONTO THE SLAB             15. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH APPROVED                    j. RETAINING WALL FOOTING REINFORCING
                            13. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH
                                                                                                                  SURFACE.                                                                      MANAGEMENT PLANS.
                                RELEVANT APPROVALS.
                                                                                                             6. DOWEL BARS ARE TO BE
                                                                                                               a. FOR 100MM THICK SLAB, 12MM Ø OF LENGTH 300MM AND SPACED AT                16. CONTRACTOR TO ENSURE SUITABLE EROSION CONTROL MEASURES                     k. RETAINING WALL BLOCKWORK PRIOR TO CORE FILL
                            14. CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL,
                                                                                                                  400MM CENTRES                                                                 ARE INSTALLED INCLUDING BUT NOT LIMITED TO SHAKE DOWNS, SILT
                                LANDSCAPE AND OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL
                                                                                                              b. FOR 125MM THICK SLAB, 16MM Ø OF LENGTH 350MM AND SPACED AT                     FENCE ETC IN ACCORDANCE WITH EROSION AND SEDIMENT CONTROL                  l. STEEL REINFORCEMENT OF CONCRETE STRUCTURES
                                CONSTRUCTION.
                                                                                                                                                                                                PLAN
                                                                                                                  300MM CENTRES
                            15. CONTRACTOR TO ORGANISE ALL DEMOLITION            PERMITS   PRIOR               c. FOR 150MM THICK SLAB, 20MM Ø OF LENGTH 400MM AND SPACED AT                                                                                               m. PRACTICAL COMPLETION
                                                                                                                                                                                            17. ADEQUATE SAFETY FENCING/BARRIERS TO BE APPLIED TO ALL
                                DEMOLITION WORKS COMMENCING ON SITE.                                              300MM CENTRES                                                                 BATTERS OR RETAINING WALLS (TEMPORARY OR PERMANENT) AS PER
                                                                                                                                                                                                RELEVANT AUSTRALIAN STANDARDS AND LEGISLATION.                             n. ON MAINTENANCE
                            16. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES,
                                ROADS AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM                     EARTHWORKS NOTES                                                               18. DUST CONTROL MEASURES ARE TO INCLUDE SPRAYING WATER ON                     o. OFF MAINTENANCE
                                SITE U.N.O.
                                                                                                             1.   FOR DETAILED GEOTECHNICAL INFORMATION, REFER GEOTECHNICAL                     UNPAVED ROADS, ACCESS TRACKS AND STOCKPILES AT A SUFFICIENT
                                                                                                                  INVESTIGATION REPORT BY GEOTECHNICAL ENGINEER. IT IS                          LEVEL TO SUPPRESS DUST GENERATION. ADDITIONALLY CONTRACTORS                p. ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER
                            17. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING                                                                                                       ARE TO COVER OR ENCLOSE STOCKPILES WHERE REASONABLY
                                                                                                                  RECOMMENDED    THAT  THE    GEOTECHNICAL  CONSULTANT   BE                                                                                                   DEVELOPMENT APPROVAL)
                                PROPERTIES AND COUNCIL ROADS AND VERGES PRIOR TO                                                                                                                PRACTICAL TO RESTRICT DUST MOVEMENT.
                                                                                                                  CONTACTED TO CONFIRM THE SOIL CONDITIONS PRIOR TO
                                COMMENCEMENT OF ANY WORKS ON SITE.
                                                                                                                  EARTHWORKS COMMENCING.
                                                                                                                                                                                            19. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON
                            18. CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS                                                                                                          THIS DRAWING, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE
                                                                                                             2.   GRASS AND TOPSOIL SHALL BE STRIPPED TO A MINIMUM DEPTH OF
                                IDENTIFIED IN THE APPROVED VEGETATION MANAGEMENT PLAN.                                                                                                          WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.
                                                                                                                  100MM OVER THE EXTENT OF THE WORKS UNLESS DIRECTED
                                CONTRACTOR TO ENSURE ALL TREE ROOTS AND STUMPS ARE
                                                                                                                  OTHERWISE AND STOCKPILED WHERE REQUIRED FOR FILL OF
                                COMPLETELY REMOVED AND BACKFILLED TO LEVEL 1 SUPERVISION.
                                                                                                                  LANDSCAPING AREAS. TOPSOIL MATERIALS MUST NOT BE USED IN                  20. ALL EXCAVATIONS ARE TO BE CONDUCTED IN ACCORDANCE WITH THE
                                CONTRACTOR TO ALLOW TO MULCH ALL CLEARED VEGETATION




                                                                                             ENERGY SERVICE PROVIDERS                                                 TELECOMMUNICATIONS
                                                                                                                                                                       SERVICE PROVIDERS                                                                elstra                                          Manual of Uniform Traffic Control Devices
           BEFORE YOU DIG               SERVICE LOCATIONS                                      AGL                                                                                                                                                            AUSTRALIA
                                                                                                                        ERGON.                                                                                                                                                                                                                      60
                                                                                                                        ENERGY
                                                                                                                                          energex                   ' yes'         Telstra
                                                                                                                                                                                                                                WARNING: OPTIC FIBRE
                                       IT IS THE RESPONSIBILITY OF THE PRINCIPAL                                                                                                                        visionstream                                                                                                                                km/h


                                      CONTRACTOR TO CONTACT ALL RELEVANT                                   origin                                                      OPTUS
                                      SERVICE AUTHORITIES TO VERIFY THE                    NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM                     NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM               EXTREME CARE TO BE TAKEN WHILE EXCAVATING IN THE
                                                                                                                                                                                                                                                                                                         NOTE: ALL SIGNS & LINE MARKING TO BE IN
                                      LOCATION OF ALL EXISTING SERVICES PRIOR                    PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED                        PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED            VICINITY OF OPTIC FIBRE CABLES. LOCATIONS ARE TO                              ACCORDANCE WITH THE MANUAL OF
                                                                                                 PRIOR TO START OF CONSTRUCTION. PHONE DBYD                            PRIOR TO START OF CONSTRUCTION. PHONE DBYD
                                      TO THE START OF CONSTRUCTION                               SERVICE LOCATIONS ON 1100 FOR DETAILS.                                SERVICE LOCATIONS ON 1100 FOR DETAILS.
                                                                                                                                                                                                                                 BE CONFIRMED PRIOR TO START OF CONSTRUCTION.                                  UNIFORM TRAFFIC CONTROL DEVICES.



                                                                                                             CLIENT DETAILS:                                                       PROJECT ADDRESS:                                                   APPROVED BY:                         PROJECT NAME:

                                                                                                                                                                                                                                                                                           PROPOSED RESIDENTIAL DUPLEX
                                                                                                                               IZAROX QLD PTY LTD                                                                                                                                          TITLE:                                         STATUS:

                                                                                                                                                                                        73 SOUTHERN CROSS PARADE                                                                            GENERAL NOTES                                 FOR APPROVAL - NOT FOR
 © ABN 89 647 469 707
                                                                                                                                                                                         SUNRISE BEACH, QLD, 4567                                                  BEN PARRY                                                              CONSTRUCTION
   75 NOOSA DRIVE                                                                                                                                                                                                                                                 RPEQ: 28084
                                 01     31/10/22   MCU / OPW ISSUE                 MVP      BRP      BRP     SCALE:
NOOSA HEADS, QLD 4567                                                                                                                                                                                                                                                CPEng
    +61 7 5211 1003              REV     DATE               DESCRIPTION            DWN      CHK      APP                                 1:100                                                                                                                    DATE: 31/10/2022
                                                                                                                                                                                                                                                                                           DRAWING NUMBER:                                PROJECT NUMBER:   SHEET REV:

RECORCONSULTING.COM                                                  REVISIONS
                                                                                                                                 DO NOT SCALE, IF IN DOUBT ASK
                                                                                                                                                                                                                                                                                            002                                           20220237
                                                                                                                                                                                                                                                                                                                                                             SIZE:
                                                                                                                                                                                                                                                                                                                                                             A1   01
Log in to download the original file

20220237 73 Southern Cross Pde SWMP.pdf · 8.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗