Original source · versioned page text
20220237 73 Southern Cross Pde SWMP
Original PDF page 15, section 1. The text section number identifies this passage in the reader.
SW
N
SW
SW
S
SW
CP 671
SP111801 RP225123
NOTES:
1. FOR GENERAL NOTES REFER DWG 002, WHICH IS TO BE REQUESTED AND
S
VIEWED PRIOR TO COMMENCEMENT OF CONSTRUCTION IF NOT SUPPLIED.
SW
W
ALL EXISTING BUILDING, EXISTING SEWER SERVICE TO BE
STRUCTURES AND IMPERVIOUS DISCONNECTED AND CAPPED OFF 2. THE CONTRACTOR WILL MAKE HIMSELF FULLY AWARE OF THE EXISTING
SURFACES TO BE REMOVED U.N.O DURING CONSTRUCTION FEATURES OF THIS SITE AND ENSURE ANY ADDITIONAL WORKS NOT
SHOWN ON THIS PLAN ARE INCLUDED IN THE CONTRACT.
S
3
.09
.2
37
SW
37
W
3. LOCATION AND DEPTH OF EXISTING SERVICES BASED ON SURVEY, DBYD
8
.7
38
AND COUNCIL RECORDS. IT IS THE CONTRACTORS RESPONSIBILITY TO
2
2
.5
37.5
38
CONFIRM ACTUAL LOCATION AND DEPTH PRIOR TO CARRYING OUT ANY
2
41
37.6
37
.
EXCAVATION OR TRENCHING WORKS.
38
S
.5
2
BAN
.4
9
.6
K 38.40
38
0.25 37
SW
38.
38
0504 86 .96
38. .89 4. CONTRACTOR TO LOCATE AND PROTECT ALL EXISTING SERVICES ON SITE
W
49 38 0 38.23
3 8.9 PRIOR TO COMMENCEMENT OF WORKS.
38.60
4
.6
EXISTING WATER SERVICE TO BE
38
37.92 DISCONNECTED AND CAPPED
39.15 5. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR TO ANY
37
4
OFF DURING CONSTRUCTION
.4
39
.9
DEMOLITION WORKS COMMENCING ON SITE.
38
.
SW
3
14 37.83
W
5
4
9
39.5
.3
.2
5
6. ALL VEGETATION WITHIN THE LIMIT OF WORKS TO BE CLEARED, MULCHED
38
38
.28
.9
39
38
PA
LM .82 AND REMOVED FROM SITE IN ACCORDANCE WITH APPROVED VEGETATION
.06
39.60
S
CL 39 38
39.81 UM 98
38. 39 TBM (Nail in Kerb) CLEARING PLAN (BY OTHERS) OR IF SCHEDULED STOCKPILE FOR USE BY
39 .20
P RL38.17 AHD LANDSCAPER.
82
.60 39.
SW
.
56
39
W
39.63 38 38
7 4 ( .5 7. CONTRACTOR TO LOCATE ALL EXISTING UTILITIES ON SITE AND MAKE
.92 38.
2
2
.66
.0
Stairs
5
40
RL41.03
39
Landing
.6
Co
( SUITABLE ARRANGEMENTS TO HAVE DISCONNECTED PRIOR TO
39
S
ncr DEMOLITION WORKS BEGINNING.
6
ete 73
.5
39
Stairs 38. 8
39
.5 .8 0 .6
8
9 38
4
.7
38
8
SW
.8
.7
39
EXISTING DRIVEWAY
39
39
8. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON
W
\ \ \ \ \ \ .45 .70 38.53
CROSSOVER TO BE REMOVED
8 \ 39 38
39.9 39 THIS DRAWING, THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE
0
.65
\
. \
.7
80
39
40 WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.
38
\
\
S
\
\ 8
BANK 0 01
\ \ \ \ \ 39.6
\
.20405 40. 9. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING
SW
\ \ \ \ \ \ \ \ \ \ \ \ \
\ .30
39 PROPERTIES AND COUNCIL ROADS AND VERGES PRIOR TO
W
\
.72
40
\ 39
rs
\ \ \ \ \ \ \ \ \ \ \ \ COMMENCEMENT OF ANY WORKS ON SITE.
.8
ai
\
40 \ \ \
7
St
TR .29
39
S
EE
01
0 21 10. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES,
5
.
.31 41.
40
.7
7
CP 010
1
39
.8
39.33
.8
ROADS AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE
40
39
SW
3
SP111802
\ \ \ \ \ \ \ \ \ \
.7
5
.
30W
.6
U.N.O.
39
39.20
39
41.04
10
6
31
.
.1
6 (
40
0
41
39.
.5
39.7
97
41
Upper Floor 11. WHERE NECESSARY, CONTRACTOR SHALL OBTAIN ALL NECESSARY
.
39
S
42
(
.15
Level RL42.49 APPROVALS TO CARRY OUT SERVICES RELOCATION OR ALTERATIONS.
(
(
SW
(
W
41.42
(
SOUTHERN CROSS PARADE
(
42.06
78
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.