131001 Minor Change Request · 132006.268.03
Attached to the e-mail Pre-Request for Minor Change to MCU - 132006.268.03.
Roadworks Contributions
15. A contribution of $5,960 shall be paid to the Council towards the cost of improvements
to the major road network of Cooroy, as a result of increase traffic generation caused by
the proposed development. The contribution shall be paid to the Council prior to
obtaining a Development Permit for Operational Works. This amount will be subject to
variations in the Consumer Price Index, All Groups Brisbane from December 2007 until
the date of payment.
16. A contribution of $160,975 shall be paid to the Council towards the cost of improvements
to Cooroy Mountain Road, as a result of increase traffic generation caused by the
proposed development. The contribution shall be paid to the Council prior to obtaining
a Development Permit for Operational Works. This amount will be subject to variations
in the Consumer Price Index, All Groups Brisbane from December 2007 until the date
of payment.
Water Quality
17. The applicant shall submit a Water Quality Management Plan for Council approval prior
to the issue of any Operational Works Permit. The Water Management Plan shall be
prepared by a suitably qualified Environment Engineer and cerifiod by a Pvogistored
Professional Engineer of Queensland. The Wator Managomont Plan shall detail water
quantity and quality roquiromonts of environments receiving runoff from the sito. The
Wator Management Plan shall domonstrato that appropriate treatment measures will be
incorporated into the proposed use to ensure the existing wator quantity and water
quality within the environment receiving runoff from all aspects of the proposed use (i.e.
including but not limited to offluont, carpark runoff and any by products of industrial use
occurring on site) are maintained in accordance with The Noosa Plan and the
Environmental Protection (Water) Policy 1997. The Water Quality Management Plan
shall address treatment of runoff from the proposed use including effluent, car park
runoff and by product of the industrial use occurring on site. It shall demonstrate that
the treatment system proposed results in a no worsening of the water quality of runoff
from the site as a result of the business operations. It will include the requirement for
water quality to be monitored for a period of three years from the construction of the car
parking and effluent disposal systems.
Effluent Disposal
18. -
18A. The design and construction of the on-site effluent disposal system and disposal area
shall be in accordance with the Conceptual Effluent Treatment and Disposal Strategy
prepared by Gilbert and Sutherland Site and Soil Investigation for On-site Wastewater
Treatment and Effluent Disposal prepared by Future-plus Environmental, dated
November 2009 February 2014, subject to the following requirements:
(i) Ongoing monitoring of treatment process and disposal areas shall be undertaken
to ensure both are functioning effectively over time. They shall be undertaken
generally as follows:
Annual monitoring shall be undertaken from the time of commissioning to
determine the quality of the wastewater produced from the effluent treatment
system;
Monitoring of the soils, vegetation and groundwater in the application area
shall be undertaken every three years to establish that such is not
percolating into the groundwater;
4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
131001 Minor Change Request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.