Council archive · source document
131001 Minor Change Request · 132006.268.03
Attached to the e-mail Pre-Request for Minor Change to MCU - 132006.268.03.
Sampling and testing shall be in accordance with relevant regulatory
requirements and manuals such as those provided by the Environmental
Protection Agency, with testing undertaken by an accredited Laboratory:
Continuous monitoring shall be undertaken by the system for any water on
the surface of the application area, downslope resurfacing, changing plant
growth on or around the application area and any other signs of problems,
and addressed through maintenance or servicing.
(jj)—A rosorvo disposal aroa 100% tho size of tho primary disposal aroa shall be
nominated and located outside required buffer areas.—The location shall be
provided as part of tho detailed design report at the Operational Works application
stage.
p)—A minimum secondary standard offluont treatment with disinfection to achieve the
required microbiological quality (i.e. 200 cfu/100mL with no samplo ovor 1000
cfu/IOOmL) shall bo adopted.
(Iv)—Detailed MEDLI modolling shall be undertaken at the Operational Works
application stage to confirm tho appropriato size for tho offluont disposal area to
onsuro this is equal to plant uptake, soil storage and onvironmontal acceptable
release rates.
(v)—More information on sourco/s and rospectivo volumes of wastewater produced
during bottling etc shall be provided—in detailed site based stormwater
management plan (SMBWMP) at the Operational Works application stage,
including monitoring of actual wastowator production rates.
(vi) Washing plant, equipment or vehicles shall be undertaken off-site. If on-site
washing of any plant or equipment is necessary, all wastewater shall be collected
in a sump and disposed of off-site as trade waste by a registered operator.
(vU)—Additional monitoring of wastowator discharge at Outflow Point 1 (G&W drawing
H J0085.1.7) is to bo carried out to domonstrato compliance with tho dosirod
SBSWMP water quality objectives in support of an Operational Works approval,
and on an ongoing monthly basis to demonstrate the continued compliance with
SBSWMP water quality objectives. This monitoring and assessment of tho impact
must—be—carried—out—compliance—with—the—Ecoaccess—operational—policy
"Wastewater Discharge to Queensland Waters".
(viii) Rehabilitation of the waterway of the site, as indicated by the 1997 Strategic Plan
(Open Space-Conservation & Waterway Protection) is to be undertaken in addition
to replanting as detailed in Drawing HJ0085.1.2 of the Conceptual Site-Based
Stormwater Management Plan.
18B. The Conceptual Effluent Treatment and Disposal Strategy prepared by Gilbert and
Sutherland, datod October 20096 assumes a combined bottled/bulk water production
volume of 24 ML/annum, which produces 7.2 ML/annum of waste water.—If the
production rates increases over 24 ML/annum, additional settlement ponds, cheSmical
treatment and flocculation is required in addition to those measures spoificied in the
Conceptual Effluent Treatment and Disposal Strategy and condition ISA of this
approval.—Those additional measures are to be achiovod through larger (vortical)
holding tanks and chemical dosing within the approved development footprint.
Erosion & Sediment Control
19. Any person acting on this permit shall prevent erosion and sediment export from leaving
the site. Site control measures such as silt fencing, controlled gravel access to the site
and controlled disposal of waste, will be necessary. In this regard plans detailing the
5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
131001 Minor Change Request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.