Council archive · source document
131001 Minor Change Request · 132006.268.03
Attached to the e-mail Pre-Request for Minor Change to MCU - 132006.268.03.
26. The development must allow refuse-loading areas to be located off street. All vehicles
associated with the collection of waste/recyclables, shall enter and leave the site in a
forward direction, without the need for any unsafe manoeuvring.
27. A Waste Management Plan (Operational) in accordance with Planning Scheme Policy
No. 9 "Waste Management Multi-Dwellings and Commercial and Industrial Premises",
must be submitted for the day-to-day operation of the development and approved by
Council's Health Section prior to issue of development permit for operational works.
It is critical that waste areas are properly planned. A copy of Planning Scheme Policy
No. 9 explaining exactly how to predict waste quantities and design waste areas is
available from Council and the web. The Plan shall include the following information: -
The types of waste that will be generated from the activities approved within the
development.
Estimated volumes or tonnage of both recyclables and waste generated.
Methods to be used for dealing with garden waste.
Initiatives to minimize waste either by waste prevention, reduction, re-use or
recycling.
Description of procedures for getting all waste to the bins; the storage of bins and
the collection of bins by the contractor.
A description of the design details of waste storage and recycling areas including
size, location, elevation and floor plan, methods of bin washing and system to
prevent storm water getting into sewer via the bin wash.
A description of types and volume of waste storage containers to be used.
The waste and recycling storage area shall include the provision of containers for
all waste and recycling materials including putresable matter, non-recycling waste,
paper/ cardboard, glass, aluminum/steel cans, waste oil, styrofoam boxes, etc,
and bin washing facilities connected to sewer.
A detailed description of vehicular access to collect waste. Where collection is off
street, access must allow vehicles to enter and leave the site in a forward direction.
28. As no Plumbing Final has been issued through Noosa Council Plumbing Services, all
existing plumbing and drainage, along with Backflow Prevention Devices, are to be
assessed to ensure compliance with current Legislation and Acts.
Additional Conditions
A1. The effluent holding tank and STP shall have visual and audible high level alarms
svstems installed with secondary power backup (eg: batterv power).
A2. The effluent facilities and grease trap facility shall be serviced and maintained on a three
monthly service regime with all documentation for maintenance and servicing forwarded
to Noosa Council.
4 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the
Assessment Manager conditions.
5 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form
conditions of approval:
7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
131001 Minor Change Request.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.