Original source · versioned page text
Att13 - Hydraulic and Wet Fire Services Investigation
CYC Noosa Campsite
__________________________________________________________________________________________
Document Verification
Job Title CYC Noosa Campsite, 48 Kabi Road, Cootharaba.
Job Number 22-0008
Document Title Master Planning Site Infrastructure Review
Document Control
Date
Document Revision No. Author Reviewer
10/03/22 Draft for Client Comment 01 SL
Approval for Issue
Name Signature Date
© Document copyright of MRP Hydraulic and Fire Services Consultants Pty Ltd
This document is and shall remain in the property of MRP. The document may only be used for the purpose for
which it was commissioned and in accordance with the Terms of Engagement for the commission.
Unauthorised use of this document in any form whatsoever is prohibited.
To the extent permitted by law, MRP expressly disclaims and excludes liability for any loss, damage, cost or
expenses suffered by any third party relating to or resulting from the use of, or reliance on, any information
contained in this report. MRP does not admit that any action, liability, or claim exist or be available to any third
party.
Ref; 22-0008
Master Planning Site Infrastructure Review Rev 01
2 March 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original