Original source · versioned page text
Bushfire Risk Assmt & Risk Mngt Plan for house at 8 Hinterland Cl, Tinbeerwah Revision 1 June 2022 ENAM
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnEcological Natural Area Management 2 Introduction 2.1 The reasons for the Bushfire Risk Assessment and Management Plan A house, to be constructed at 8 Hinterland Cl, Tinbeerwah, Queensland in the Noosa Council jurisdiction is mapped in a Potential Bushfire Impact Buffer area on The Noosa Plan Bushfire Overlay and in a Potential Bushfire Impact Buffer area on Queensland Potential Bushfire Intensity mapping. Therefore, the house is deemed to potentially be in a Bushfire Prone Area and an assessment of the bushfire risk to the building and a bushfire risk management plan is required. As the house is mapped in a Potential Bushfire Impact Buffer area on The Noosa Plan Bushfire Overlay and in a Potential Bushfire Impact Buffer area on Queensland Potential Bushfire Intensity mapping this report will detail bushfire hazard assessments for: • Bushfire Resilient Communities as referenced by Queensland State Planning Policy 2017 for Asset Protection Zone requirements and • Australian Standard AS3959 Construction of buildings in bushfire-prone areas for Deemed to Satisfy building requirements • The Noosa Plan 2020 Bushfire Hazard Overlay Code 2.2 Commissioning of the Bushfire Risk Assessment and Management Plan Ecological Natural Area Management has been commissioned to prepare a Bushfire Risk Assessment and Bushfire Risk Management Plan to fulfil the above requirements. See Appendix 3 for demonstration that the author is a “qualified and experienced consultant with appropriate and proven technical expertise in the preparation of bushfire hazard assessment reports and management plans”. 2.3 The aim of the Bushfire Risk Assessment and Management Plan The aim of this bushfire impact assessment report is to achieve appropriate levels of bushfire protection for the developed properties while maintaining ecological sustainability. Bushfire protection for buildings in bushfire prone areas is best achieved using a mix of: •Fire resistant building technologies in the structures. •Fire resistant methodologies in the structures such as minimising ember lodgement points •Providing and appropriate fire break between the developed properties and flammable vegetation. • Appropriate building siting for bushfire protection • Fuel management in the flammable vegetation near the developed properties while maintaining ecological values of the vegetation habitat. • Fuel management between the flammable vegetation and the developed properties. • Maintenance of ecological and habitat values of any vegetation subject to vegetation management for bushfire risk management. To achieve the aim, the Plan will conduct bushfire assessments against the applicable legislative requirements and make recommendations that address the requirements of these legislation. Bushfire Risk Assessment and Management Plan for a house at 8 Hinterland Cl, Tinbeerwah June 2022 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.