3. FINAL-160721-BA4090-Town Planning Report
Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application IDAS Forms, Planning report & Plans email 1 of 3.
vii. where appropriate, has the OR
ability to accommodate public
transport services; g) A combination of the principles
in these documents.
b) road pavement surfaces—
S7.3 On-road cycling treatment is
i. are durable enough to carry utilised to provide safe and
estimated wheel loads of travelling continuous movement of cyclists
and parked vehicles; ii. provide for along a roadway, such as--
the safe passage of vehicles,
pedestrians, cyclists, and a) sealed shoulders;
discharge of stormwater run-off
b) wide kerbside lane;
from contributing catchments and
the preservation of all weather c) exclusive or peak period bicycle
access; lane;
c) kerb and channel— d) advisory treatments such as
Bicycle Awareness Zone;
i. controls vehicle movement by
delineating the carriageway for all e) shared parking / bicycle lane;
users;
f) contra flow bicycle lane; and
ii. conveys road pavement run-off
to stormwater drainage in a g) bus/bicycle lane.
manner that allows the road to be
S7.4 The provision of bicycle
trafficable in Q100 ARI local
lanes at intersections is generally
rainfall events; and
in accordance with AUSTROADS
d) verges and footpaths provide— Part 14, section 5 and the Manual
of Urban Traffic Control Devices
i. safe access for pedestrians and (MUTCD) Part 9.
cyclists clear of obstructions;
ii. an access area for vehicles onto
properties;
iii. a corridor allocated for services
and utilities; and
iv. additional amenity for minor
roads.
O8 Stormwater drainage S8.1 Stormwater drainage S8.1 – S8.3 Complies
infrastructure is planned, designed planning, design and construction
and constructed to— is in accordance with Section 4 of A Stormwater Management Plan
PSP5 Engineering Design has been prepared for the site.
a) be accessible, cost effective Standards – Roads, Drainage and The Stormwater Management
and easily maintainable; Earthworks; Plan indicates that the
development can be carried out in
b) protect downstream capacity; S8.2 As Constructed data is accordance with Council’s
submitted in accordance with stormwater drainage
c) protect downstream water
Section 6 of PSP5 Engineering requirements.
quality;
Design Standards – Roads,
Please refer to the Stormwater
d) maximise on-site stormwater
URBIS
APPENDICES NOOSA ENERGY CENTRE
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.