3. FINAL-160721-BA4090-Town Planning Report

Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application IDAS Forms, Planning report & Plans email 1 of 3.

of 143

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

retention and retardation; and        Drainage and Earthworks;             Management Plan attached in
                                                                           Volume 5.
e) convey run-off to stormwater       S8.3 Stormwater drainage
drainage in a manner that allows      planning, design and construction
roads to be trafficable in Q100 ARI   is in accordance with the
local rainfall events.                Queensland Urban Drainage
                                      Design Manual.

O9 Roads and stormwater               S9.1 Roads and stormwater            S9.1 – S9.2 Complies
drainage infrastructure is            drainage infrastructure is
constructed—                          constructed in accordance with—      A Stormwater Management Plan
                                                                           has been prepared for the site.
a) in accordance with appropriate     a) Sections 2, 3 and 4 of PSP5       The Stormwater Management
engineering standards; and            Engineering Design Standards –       Plan indicates that the
                                      Roads, Drainage and Earthworks;      development can be carried out in
b) to minimise adverse                                                     accordance with Council’s
environmental impacts, including      b) Queensland Design Code for        stormwater drainage
from run-off and erosion.             Residential Streets;                 requirements.

                                      c) AUSTROADS; or                     Please refer to the Stormwater
                                                                           Management Plan attached in
                                      d) A combination of the principles
                                                                           Volume 5.
                                      in these documents;

                                      S9.2 Erosion and sediment control
                                      measures are designed and
                                      implemented in accordance with
                                      the Institution of Engineers
                                      Australia (Queensland Division)
                                      Soil Erosion and Sediment Control
                                      - Guidelines for Queensland
                                      Construction Sites.

Environmental Protection

O10 Roads and stormwater              S10.1 Roads and stormwater           S10.1 – S10.5 Complies
drainage infrastructure are located   drainage follow the edge of
and aligned so as to—                 existing disturbed areas, or         A Stormwater Management Plan
                                      alternatively, these works are co-   has been prepared for the site.
a) minimise disturbance to native     located within a combined utility    The Stormwater Management
vegetation and/or other habitat       corridor;                            Plan indicates that the
areas;                                                                     development can be carried out in
                                      S10.2 Roads avoid native             accordance with Council’s
b) protect and maintain wildlife      vegetation and provide for fauna     stormwater drainage
corridor movements and the            underpasses and associated           requirements.
safety of native fauna;               fencing where appropriate;
                                                                           Please refer to the Stormwater
c) minimise changes to the            S10.3 Road infrastructure within     Management Plan attached in
hydrological regime, including        or adjacent to native habitat        Volume 5.
drainage patterns, run-off and        incorporates fences which allow
water quality;                        for protected wildlife movement
                                      and controls unrestricted access
d) avoid crossing watercourses,
                                      of domestic cats and dogs;
drainage lines and wetlands, but



URBIS
NOOSA ENERGY CENTRE                                                                                  APPENDICES
Log in to download the original file

3. FINAL-160721-BA4090-Town Planning Report.pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.