Skip to the record
Search everything, all in one place.

Original source · versioned page text

3. FINAL-160721-BA4090-Town Planning Report

Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application IDAS Forms, Planning report & Plans email 1 of 3.

of 143

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

wastewater to a waterway or off     (WWMP) is prepared by a             is not required as the wastewater
site unless demonstrated to be      suitably qualified person and       is connected the existing sewer
best practice environmental         addresses:                          infrastructure.
management for that site.
                                    a. wastewater type, and             For further details, please refer to
                                                                        Volume 5 for the Stormwater
                                    b. climatic conditions, and         Management Plan.
                                    c. water quality objectives
                                    (WQOs), and

                                    d. best-practice environmental
                                    management, and

                                    AO2.2

                                    The WWMP provides that
                                    wastewater is managed in
                                    accordance with a waste
                                    management hierarchy that:

                                    a. avoids wastewater discharges
                                    to waterways, or

                                    b. if wastewater discharge to
                                    waterways cannot practicably be
                                    avoided, minimises wastewater
                                    discharge to waterways by re-
                                    use, recycling, recovery and
                                    treatment for disposal to sewer,
                                    surface water and groundwater.

PO3                                 AO3.1                               Not applicable

Any non-tidal artificial waterway   If the proposed development         The proposal does not involve
is located in a way that is         involves a non-tidal artificial     non-tidal artificial waterways.
compatible with the land use        waterway:
constraints of the site for
protecting water environmental      a. environmental values in
values in existing natural          downstream waterways are
waterways.                          protected, and

                                    b. any groundwater recharge
                                    areas are not affected, and

                                    c. the location of the waterway
                                    incorporates low lying areas of a
                                    catchment connected to an
                                    existing waterway, and

                                    d. existing areas of ponded water
                                    are included, and

                                    AO3.2



                                                                                                                  URBIS
APPENDICES                                                                    FINAL-160721-BA4090-TOWN PLANNING REPORT
Log in to download the original file

3. FINAL-160721-BA4090-Town Planning Report.pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.