3. FINAL-160721-BA4090-Town Planning Report
Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application IDAS Forms, Planning report & Plans email 1 of 3.
Non-tidal artificial waterways are
located:
a. outside natural wetlands and
any associated buffer areas, and
b. to minimise disturbing soils or
sediments, and
c. to avoid altering the natural
hydrologic regime in acid sulfate
soil and nutrient hazardous
areas.
PO4 AO4.1 Not applicable
Any non-tidal artificial waterway Where a non-tidal artificial The proposal is not located
is located in a way that is waterway is located adjacent to, adjacent to, or is connected to, a
compatible with existing tidal or is connected to, a tidal tidal waterway.
waterways. waterway by means of a weir,
lock, pumping system or similar:
a. there is sufficient flushing or a
tidal range of >0.3 m, or
b. any tidal flow alteration does
not adversely impact on the tidal
waterway, or
c. there is no introduction of salt
water into freshwater
environments.
Design to avoid/minimise new impacts
PO5 AO5.1 Not applicable
Stormwater does not discharge Any non-tidal artificial waterway The proposal does not involve
directly to a non-tidal artificial is designed and managed for any non-tidal artificial waterway.
waterway without treatment to of the following end-use
manage stormwater quality purposes:
management
a. amenity including aesthetics,
landscaping and recreation, or
b. flood management, or
c. stormwater harvesting as part
of an integrated water cycle
management plan, or
d. aquatic habitat, and
AO5.2
URBIS
FINAL-160721-BA4090-TOWN PLANNING REPORT APPENDICES
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.