3. FINAL-160721-BA4090-Town Planning Report

Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application IDAS Forms, Planning report & Plans email 1 of 3.

of 143

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                  The end-use purpose of any non-
                                  tidal artificial waterway is
                                  designed and operated in a way
                                  that protects water environmental
                                  values.

Construct to avoid/minimise new impacts

PO6                               AO6.1                               AO6.1 Complies

Construction activities for the   An erosion and sediment control     Erosion and sediment control
development avoid or minimise     plan (ESCP) demonstrates that       plans will be prepared and
adverse impacts on stormwater     release of sediment-laden           implemented for the project in
quality.                          stormwater is avoided for the       accordance with Noosa Council
                                  nominated design storm, and         Requirements.
                                  minimised when the nominated
                                  design storm is exceeded, by
                                  addressing design objectives
                                  listed below in Table A
                                  (construction phase) or local
                                  equivalent, for:

                                  a. drainage control, and

                                  b. erosion control, and

                                  c. sediment control, and

                                  d. water quality outcomes, and

                                  AO6.2

                                  Erosion and sediment control
                                  practices (including any
                                  proprietary erosion and sediment
                                  control products) are designed,
                                  installed, constructed, operated,
                                  monitored and maintained, and
                                  any other erosion and sediment
                                  control practices are carried out
                                  in accordance with local
                                  conditions and appropriate
                                  recommendations from a suitably
                                  qualified person, or

                                  AO6.3

                                  The ESCP demonstrates how
                                  stormwater quality will be
                                  managed in accordance with an
                                  acceptable regional or local
                                  guideline so that target
                                  contaminants are treated to a
                                  design objective at least


                                                                                                               URBIS
APPENDICES                                                                 FINAL-160721-BA4090-TOWN PLANNING REPORT
Log in to download the original file

3. FINAL-160721-BA4090-Town Planning Report.pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.