Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

3 Gibson Road NSC Application Letter

Attached to the e-mail Operational Works Application - 3 Gibson Road_ Noosaville.msg.

of 50

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

B Ingleton - 3B-452 Page 3

11.

12.

13.

14.

1S.

16.

17.

18.

19.

20.

Any advertising sign or device is to comply with the provisions of
Council's policies on advertising. The applicant is to submit a signage
plan for the site, detailing proposed areas for signage and indicating a co-
ordinated strategy. This plan is to be submitted and approved by the Shire
Planner, prior to release of Building Approval.

All separate, adjoining lots that form part of this application are to be
amalgamated into one undivided lot in accordance with Section 5.11 of the
Local Government (Planning and Environment) Act, prior to the issue of a
Building Approval.

The footpath across the frontages of the site is to be upgraded by the
provision of a 1.2 metres wide concrete footpath and the forming, grassing
and topsoiling of the remaining area to the standards and requirements of
the Shire Engineer. The applicant is to contact Council's Engineering
Department to determine the footpath alignment prior to the
commencement of any works.

The developer shall bear the cost of alteration of any public utility or other
facilities necessitated by the development of the land or associated
construction works external to the site.

Connection to Council's existing water supply and sewerage reticulation
systems at the developer's expense to the standards and requirements of
Council's Shire Engineer.

The developer shall provide metered water connections from the water
supply system to the proposed development, in accordance with Council's
standards and to the satisfaction of the Shire Engineer.

Roof and surface water is to be collected on site and is to be discharged
through a single underground drain line into existing drainage in Gibson
Road to the satisfaction of the Shire Engineer. A Building Approval shall
not be granted until the Shire Engineer has approved of the drainage
scheme.

The storage of any machinery, materials or vehicles is to be aesthetically
screened so as not to be visible from any road to which it has frontage, to
the reasonable satisfaction of the Shire Planner.

The footpath and setback areas are to be kept clear of goods, signs and
street furniture not approved by Council.

Submission of a cash bond or trading bank guarantee to the sum of $5,000
to secure performance of conditions, prior to the issue of Building
Approval. The cash bond or trading bank guarantee will be returned upon
performance of the conditions of approval.

c:\prod\word\letters\3b452.app
Log in to download the original file

3 Gibson Road NSC Application Letter.pdf · 6.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.