of bushfire assessment and management.
Sustainability
10. Council encourages sustainable and energy efficient building design for all
development, including the use of sustainable building materials, energy efficient
fittings, solar hot water, photovoltaic systems (including the use of inverter/charges),
solar panels, water saving devices and rainwater harvesting.
Performance Bond
11. Where the works include Council assets (construction of new or modification to
existing) a portion of the performance bond will be retained as a “maintenance bond” as
described in Council’s Planning Scheme Policy 6 Engineering Design Standards.
Alternatively, the developer may submit a separate “maintenance bond” at the
completion of work.
The bond amount will be
a. 5% of the agreed value of the works or
b. $1500, whichever is the greater amount
Preparation of a Preliminary Construction Management Plan
12. A preliminary Construction Management Plan must be submitted with the Operational
Works application and must address the following:
a. A Traffic Management Control Plan in accordance with the Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
control measures prior to construction.
i. a Traffic Management Control Plan in accordance with the Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
and traffic control measures prior to construction.
ii. maintenance of safe pedestrian access for the areas affected by the works
during and after daily construction has ceased.
iii. proposed fencing to the site during the construction phase of the
development.
iv. approval of the Traffic Management Control Plan by the Department of
Transport and Main Roads (DTMR) for any works on State controlled
roads.
v. provision for worker car parking.
b. Maintenance and protection of water quality and existing drainage lines through
the construction site, through the implementation of appropriate erosion and
sediment control measures
c. Works programme identifying key components of the works and their respective
durations
d. Establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic, services and other relevant issues
e. Include a post out to the local residents and businesses advising of the proposed
development, the expected time frames and the site contact details
f. Include signage in prominent locations on the boundaries of the site advising of
the proposed development, the expected time frames and the site contact details.
g. Identification of complaint management procedures including:
11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.