Original source · versioned page text
Attachment A to Judgment for 19Aug 2024 (6)
Very large file (32.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
a. the Disability Discrimination Act 1992 (Commonwealth);
b. the Anti-Discrimination Act 1991 (Queensland); and
c. the Disability (Access to Premises – Building) Standards.
Nature Conservation Act
3. It is the responsibility of the applicant to ensure compliance with the Nature
Conservation Wildlife Management Regulation 2006 which is regulated by the State
Government.
There may be a requirement to undertake a Flora Survey pursuant to Flora Survey
Guidelines prior to any clearing activities pursuant to Chapter 4 of the Nature
Conservation Wildlife Management Regulation 2006. Exemptions are listed in Division
5 of the same Act. Further information can be obtained at this website
hiips://www.ehp.qld.gov.au/licences-permits/plants-animals/protected-plants/ or by
calling the Department of Environment and Heritage Protection on 1300 130 372.
There may also be a requirement to obtain State Government Approval of a Species
Management Plan prior to any activities that tamper with any place that is being used
by a native animal for breeding activities. This is regulated by Section 332 of the
Nature Conservation Wildlife Management Regulation 2006. Further information
regarding this matter can be obtained at this website
hiips://www.ehp.qld.gov.au/licences-permits/plants-animal/species-management-
program/ or by calling the relevant State Department.
Qualified Person
4. For the purpose of preparing a Geotechnical Report, and for certifying geotechnical
stability for the development, a qualified person is considered to be a person who:
a. is a Registered Professional Engineer of Queensland (RPEQ); and
b. has a degree in civil engineering or engineering geology; and
c. has a minimum of 5 years experience in the field of geotechnical engineering or
engineering geology.
5. For the purpose of preparing a Landscape Plan, a qualified person is considered to be
a landscape architect, landscape designer or horticulturalist with a minimum of 3 years
current experience in the field of landscape design.
6. For the purpose of preparing an Arborist Report, a qualified person is considered to be
a person with either:
a. ISA certification; or
b. a Diploma of Arboriculture in addition to a minimum of 3 years current experience in
the field of arboriculture.
7. For the purposes of preparing a Rehabilitation Plan, a qualified person is considered to
be a landscape architect or ecologist with a minimum of 3 years current experienced in
the field of landscape design.
8. For the purposes of preparing a Fauna Management Plan, a qualified person is
considered to be an ecologist with a minimum of 3 years current experience in the field
of fauna assessment and management.
9. For the purpose of preparing a Bushfire Management Plan, and for certifying
compliance with the bushfire requirements of this Decision Notice, a qualified person is
considered to be an ecologist with a minimum of 3 years current experience in the field
10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.