Original source · versioned page text
Attachment A to Judgment for 19Aug 2024 (6)
Very large file (32.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Linke and Linke Surveys SLR Ref No: 620.31071-R01-v3.0-FEMP.docx Flood Emergency Management Plan February 2024 111 Lake Weyba Drive, Noosaville Table 10 Flood Height Information Flood Level Description Equivalent Flood (mAHD) Event 1.1 Trigger level for preparation for site evacuation. 10 % AEP Minor Flood Level at Tewantin River gauge. 1.3 Trigger level for commencement of site evacuation. Between Moderate Flood Level at Tewantin River gauge. 2% and 5% AEP 1.5 Level at which overtopping of access road commences. 1% AEP (current climate) 1.8 Major Flood Level at Tewantin River gauge. 6.3.3 Roadside Flood Depth Board A roadside flood depth board shall be installed within the common property on the site to indicate the depth of flooding to residents. It is unlikely that these boards will be required as evacuation should have occurred prior to flooding being recorded at roadside flood depth boards. However, should evacuation not occur, this board will assist to deter residents from driving in floodwaters. The presence of flood depth boards is a reminder that the area is subject to flooding. 6.4 Emergency Action Plan An Emergency Action Plan (EAP) provides a road map of activities based on the risks and consequences of the event. The plan should appropriately balance the need for site operations and prioritise the safety of the community. The EAP follows the four levels of action described in the Queensland Disaster Management Arrangements (2018), detailed in Table 11. Table 11 Emergency Action Plan Levels of Activation Level of Activation Definition A heightened level of vigilance and preparedness due to the possibility of an event in Alert the area of responsibility. Some action may be required and the situation should be monitored by staff capable of assessing and preparing for the potential threat. An operational state prior to ‘stand up’ characterised by a heightened level of situational awareness of a disaster event (either current or impending) and a state of Lean Forward operational readiness. Disaster coordination centres are on stand-by, prepared but not activated. The operational state following ‘lean forward’ whereby resources are mobilised, Stand up personnel are activated and operational activities commenced. Disaster coordination centres are activated. Stand down Transition from responding to an event back to normal core business Stand down and/or recovery operations. There is no longer a requirement to respond to the event and the threat is no longer present. Page 22 47
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.