Attachment A to Judgment for 19Aug 2024 (6)

of 91

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (32.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

             b. comprise feature vegetation (either existing or planted) in preference to built
                    forms.
             c. Integrate with the landscape design of the balance of the estate.
             d. be constructed or durable and low maintenance materials.
             e. Be treated with a graffiti resistant coating.
             f.     Not restrict pedestrian access.


     45. Any estate entrance works must be undertaken in accordance with an Operational
         Works approval.

Retention Of Existing Trees
     46. For trees not marked for removal on Overall Development Layout Plan RL30 Revision
         C:

             a. Any development works occurring within the tree protection zones are to be
                supervised by a suitably qualified* Arborist and carried out in accordance with
                an Arborist Report for the development referenced in a Development Permit for
                Operational Works;

             b. For development works within the tree protection zones, that tree may be
                removed where an Arborist Report prepared in accordance with this condition
                identifies that, having considered if reasonable measures can be implemented
                to avoid removal of the tree, no such measures can be implemented. The
                Arborist Report prepared in accordance with this condition must be submitted
                and approved by Council prior to any tree removal works commencing.
                  * (Refer to Advisory Note)

     47. Prior to the prestart meeting, a bank guarantee, or a bond of $15,000 must be lodged
         as security for the protection of the trees not permitted to be removed by the conditions
         of this approval or related Operational Works approval. The bond:


             a. may be drawn upon by Council in its entirety if any one tree identified for
                retention is damaged to the point where the tree cannot be saved (as confirmed
                by the project arborist and agreed in writing by Council).
             b. will be returned upon practical completion of all the operational works relating to
                this development.

Land Rehabilitation
     48. The land area within Lots 3, 4, 7 and 8 must be rehabilitated in accordance with the
         approved Bushland & Wetland Rehabilitation Plan by NCES (Rehabilitation Plan).
         The rehabilitation works must be undertaken in accordance with an Operational Works
         approval.


     49. Prior to the sealing of the plan of survey, certification must be submitted to Council from
         a qualified person * which certifies that the rehabilitation works (to the ‘maintenance
         period’) have been carried out in accordance with the Rehabilitation Plan.
* (Refer to Advisory Note)

     50. At the time of registering the plan of survey, a vegetation preservation covenant must



                                                                                                       7
Log in to download the original file

Attachment A to Judgment for 19Aug 2024 (6).pdf · 32.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.