Original source · versioned page text
Attachment A to Judgment for 19Aug 2024 (6)
Very large file (32.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
a. for lots 3, 4, 7, and 8, the requirements of Section 6.2 ‘Bushfire Protection Zone’
and associated Bushfire Covenant;
b. for lots 1-8, the requirements of Section 6.3 ‘Landscaping’ of the BMP in relation
to landscaping (including fencing).
60. The BMP (and associated procedures) must be complied with at all times. The owners
of the proposed lots, including successive landowners, are responsible for
implementing the BMP.
61. A clause must be included in the contract of sale for lots 3, 4, 7, and 8, which requires
future dwellings to be constructed in accordance with any building siting and
construction requirements specified in the Bushfire Management Plan for the
development.
62. At the time of registering the plan of survey, a covenant is to be registered over the
‘Bushfire Protection Zone’ shown in the BMP and as confirmed by survey, against the
titles of Lots 3, 4, 7 and 8, in Council’s favour generally in accordance with the
Approved ‘Draft Bushfire Covenant.
Bushfire Management – Future Building Requirements
63. On lots 3, 4, 7, and 8, all future buildings classified by the National Construction Code
as either a Class 1 habitable building (ie. dwellings) or a Class 10a non-habitable
building (ie. private garages, sheds, carports), are to be constructed on the filled
building pad areas outside of the Bushfire Covenant registered against those lots in
accordance with condition 62 of this Development Approval.
Advisory Notes
PLANNING
Aboriginal Cultural Heritage Act 2003
1. There may be a requirement to establish a Cultural Heritage Management Plan and/or
obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The
ACH Act establishes a cultural heritage duty of care which provides that:”a person who
carries out an activity must take all reasonable and practicable measures to ensure the
activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with
the duty of care. Substantial monetary penalties may apply to individuals or
corporations breaching this duty of care. Injunctions may also be issued by the Land
and Resources Tribunal, and the Minister administering the ACH Act can also issue
stop orders for any activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit to discuss any obligations under the ACH
Act.
Equitable Access and Facilities
2. The plans for the proposed building work have NOT been assessed for compliance with
the requirements of the National Construction Code – Building Code of Australia
(Volume 1) as they relate to people with disabilities. Your attention is also directed to
the fact that in addition to the requirements of the National Construction Code as they
relate to people with disabilities, one or more of the following may impact on the
proposed building work:
9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.