Our Ref: 20240881 Council Ref: MCU24/0120 and OPW24/0143 12 November 2024 Noosa Council PO Box 141 Tewantin QLD 4565 Via email: [email protected] Attention: Georgina Schramm Dear Georgina, INFORMATION RESPONSE - DEVELOPMENT PERMIT FOR A MATERIAL CHANGE OF USE (DUAL OCCUPANCY) AND ASSOCIATED OPERATIONAL WORKS (ENGINEERING AND LANDSCAPE WORKS) AT 3 AVOCET PARADE, PEREGIAN BEACH (LOT 320 P93113) Further to Council’s Information Request issued 10 October 2024, we now respond in full to each of the items raised. In support of this response, please find enclosed: ● Revised Architectural Plans prepared by Blackwood Architecture; ● Traffic Engineer Letter prepared by Modus Transport and Traffic Engineering; ● Revised Engineering Plans prepared by SCG Consulting Engineers; and ● Revised Landscape Plans prepared by Element Design. Please find below the response to each of the items raised by Council: Item 1 Provide plans that demonstrate that suitable sight lines/distances can be provided for the proposed vehicle access for the southern unit. The plans must include existing services, existing and proposed vegetation within the road reserve and the property, property fencing. If suitable sight lines/distances cannot be achieved provide an amended design for the development. Response: Modus Transport and Traffic Engineering was engaged to prepare a ‘stopping sight distance review’ of the southern unit’s driveway. Please refer to the attached Traffic Engineering Letter. The letter recommends a Concealed Driveway sign be implemented within the verge to assist with throughbound vehicles being aware of vehicles exiting a driveway where sight distance is reduced, and that vegetation within the verge near the 90 degree bend is to be cleared to achieve sufficient visibility. Refer to Figure 1 below.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 5 pages
Page 2
Figure 1: Traffic Engineering Recommendations Plan
Item 2
Provide amended civil works plans.
Response: Please refer to the revised Engineering Plans prepared by SCG Consulting Engineers. The
standard of infrastructure conditioned by MCU20/0024 and OPW20/0055 has been maintained. The
footpath has been removed from all specialist documentation.
Item 3
Remove the structure from the front setback.
Response: The Unit 2 arbour has been reduced in size and will be setback 3.005m from the southern
front boundary. The arbour is a lightweight and open structure and will include climber planting to
visually soften the development in accordance with the Landscape Plans. In accordance with AO6.1 of the
Dual Occupancy and Multiple Dwelling Code, the arbours also assist with providing a clearly identifiable
entry area to units. The table below shows the original versus revised design outcome.
2
Page 3
Original Design Revised Design
Item 4
Provide increased soft landscaping setback of a minimum of 2 metres.
Response: Refer to the Architectural Plans. The Unit 2 pool setback has been increased to 2m.
Accordingly, deep landscaping has been provided. Refer to Figure 2 below.
Figure 3: Amended landscaping plan
Item 5
Provide revised fencing plan and address the above-mentioned outcome.
Response: Refer to the Architectural Plans. Fencing has been reduced to show a maximum height of
2m. Refer to Figures 3 and 4 below.
3
Page 4
Figure 3: Proposed fencing
Figure 4: Proposed fencing
Item 6
Provide revised gross floor area calculations in compliance with the Performance outcome
PO11 of the Medium Density Residential Zone Code and administrative terms.
Response: The Architectural Plans have been revised to relocate the laundry within the garage of each
unit. The Unit 2 entry and upper level ensuite/walk-in-robe has also been reduced. The GFA Calculation
Plan (Drawing No. DA.21) has been revised in light of Council’s Information Request, and now includes
the level transition areas raised by Council. The revised plan confirms that the proposal can achieve a plot
4
Page 5
ratio of 0.4:1 in accordance with AO11 of the Medium density residential zone code. The key changes are
annotated in red, and have been extracted in Figure 5 below.
Figure 5: GFA Plan Revisions
Item 7
Provide revised plans showing the developments site coverage from a birdseye view rather
than per storey for clarity.
Response: Refer to Drawing No. DA.19 within the revised Architectural Plan set, confirming a proposed
site cover of 40% from a birdseye view.
Item 8
Provide revised landscaping plans noting the above-mentioned items.
8.1. Increase the landscaping width between the side boundaries to suitably accommodate
and support the establishment of soft landscaping.
8.2. Remove outdoor seating area from contributing to soft landscaping calculations.
Response: Refer to the revised Architectural and Landscape Plans. The originally proposed gravel along
the northern side boundary has been replaced with a garden. More landscaping is proposed along the
eastern side boundary, particularly adjacent to the drying/services areas.
Outdoor seating has been removed from the soft landscape calculations, and the increased landscaping
as described above results in a total of 67.42% landscaping proposed, exceeding the 60% requirement.
Item 9
Provide clarification regarding the notation and provide an amended plan.
Response: Refer to revised Engineering Plans. This annotation has been removed from the plans.
We thank Council on behalf of the applicant for assessing the attached additional application material.
5
Page 6
Based on the information provided in this application we respectfully request that Council proceed to
issue an approval.
Should you have any questions with respect to the above, please do not hesitate to contact the
undersigned.
Yours faithfully,
Adapt Development Management Pty Ltd
Tiani Boulton
Director
E: [email protected]
M: 0404 924 160
6
Used in these records
Information Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.