Council archive · source document
Information Response · MCU24/0120
Figure 1: Traffic Engineering Recommendations Plan Item 2 Provide amended civil works plans. Response: Please refer to the revised Engineering Plans prepared by SCG Consulting Engineers. The standard of infrastructure conditioned by MCU20/0024 and OPW20/0055 has been maintained. The footpath has been removed from all specialist documentation. Item 3 Remove the structure from the front setback. Response: The Unit 2 arbour has been reduced in size and will be setback 3.005m from the southern front boundary. The arbour is a lightweight and open structure and will include climber planting to visually soften the development in accordance with the Landscape Plans. In accordance with AO6.1 of the Dual Occupancy and Multiple Dwelling Code, the arbours also assist with providing a clearly identifiable entry area to units. The table below shows the original versus revised design outcome. 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Information Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.